Central African Republic vs Tanzania: Time required to deal with construction permits
Central African Republic
203 days
in 2012
Tanzania
206 days
in 2012
Central African Republic rank
17th
Tanzania rank
16th
Time required to deal with construction permits over time
- Central African Republic
- Tanzania
How they compare
Tanzania currently reports 206 days against 203 days in Central African Republic, a difference of 3 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Central African Republic ahead.
Central African Republic ranks 17th and Tanzania ranks 16th of 50 countries.
Across the 2 decades both report, Central African Republic averaged higher in 1 and Tanzania in 1.
Head to head by decade
| Decade | Central African Republic | Tanzania | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 203 days | 190 days | 13 days | Central African Republic |
| 2010s | 203 days | 206 days | 3 days | Tanzania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Central African Republic or Tanzania?
- Tanzania, at 206 days against 203 days in Central African Republic as of 2012.
- What is the difference in time required to deal with construction permits between Central African Republic and Tanzania?
- 3 days, with Tanzania ahead.
- How many years of comparable data are there for Central African Republic and Tanzania?
- 8 years are reported by both, from 2005 to 2012.
- How do Central African Republic and Tanzania rank globally for time required to deal with construction permits?
- Central African Republic ranks 17th and Tanzania ranks 16th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.