Time required to deal with construction permits in Tanzania

Tanzania: Time required to deal with construction permits was 206 days in 2012. ▲ Rising

Latest (2012)
206 days
Change on year
unchanged
World rank
16th
of 50 countries
All-time high
206 days
in 2009
All-time low
186 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Tanzania, 2005–2012

0501001502002005200820122005: 186 days2006: 186 days2007: 186 days2008: 186 days2009: 206 days2010: 206 days2011: 206 days2012: 206 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Tanzania is 206 days, measured in 2012. That is the highest value across all 8 years on record.

The figure is up 10.8% over ten years.

Tanzania ranks 16th of 50 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 190 days 186 days 206 days 5
2010s 206 days 206 days 206 days 3

Countries ranked near Tanzania

  1. 13 Egypt 218 days compare
  2. 13 Ghana 218 days compare
  3. 15 Senegal 210 days compare
  4. 17 Central African Republic 203 days compare
  5. 18 Congo 201 days compare
  6. 19 Malawi 200 days compare

See the full ranking of 56 places →

More private sector data for Tanzania

All data for Tanzania →

Frequently asked questions

What is time required to deal with construction permits in Tanzania?
Time required to deal with construction permits in Tanzania was 206 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Tanzania?
The highest recorded value was 206 days in 2009.
What is the lowest time required to deal with construction permits recorded in Tanzania?
The lowest recorded value was 186 days in 2005.
How does Tanzania rank for time required to deal with construction permits?
Tanzania ranks 16th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Tanzania?
Over the last ten years it is up 10.8%. The long-run trend across the full record is rising.
Where does this Tanzania data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.