Chad vs Mauritius: Time required to deal with construction permits
Chad
154 days
in 2012
Mauritius
143 days
in 2012
Chad rank
28th
Mauritius rank
31st
Time required to deal with construction permits over time
- Chad
- Mauritius
How they compare
Chad currently reports 154 days against 143 days in Mauritius, a difference of 11 days.
That makes Chad's figure about 1.1 times Mauritius's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mauritius ahead.
Chad ranks 28th and Mauritius ranks 31st of 50 countries.
Across the 2 decades both report, Chad averaged higher in 1 and Mauritius in 1.
Head to head by decade
| Decade | Chad | Mauritius | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 154 days | 159.8 days | 5.8 days | Mauritius |
| 2010s | 154 days | 143 days | 11 days | Chad |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Chad or Mauritius?
- Chad, at 154 days against 143 days in Mauritius as of 2012.
- What is the difference in time required to deal with construction permits between Chad and Mauritius?
- 11 days, with Chad ahead.
- How many years of comparable data are there for Chad and Mauritius?
- 8 years are reported by both, from 2005 to 2012.
- How do Chad and Mauritius rank globally for time required to deal with construction permits?
- Chad ranks 28th and Mauritius ranks 31st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.