Time required to deal with construction permits in Chad

Chad: Time required to deal with construction permits was 154 days in 2012. ▬ Flat

Latest (2012)
154 days
Change on year
unchanged
World rank
28th
of 50 countries
All-time high
154 days
in 2005
All-time low
154 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Chad, 2005–2012

0501001502005200820122005: 154 days2006: 154 days2007: 154 days2008: 154 days2009: 154 days2010: 154 days2011: 154 days2012: 154 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Chad stood at 154 days. That is the highest value across all 8 years on record.

The figure is unchanged over ten years.

That places Chad 28th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 154 days 154 days 154 days 5
2010s 154 days 154 days 154 days 3

Countries ranked near Chad

  1. 25 Equatorial Guinea 166 days compare
  2. 26 Rwanda 164 days compare
  3. 27 Guinea-Bissau 163 days compare
  4. 29 Cameroon 147 days compare
  5. 30 Botswana 145 days compare
  6. 31 Comoros 143 days compare
  7. 31 Gambia 143 days compare
  8. 31 Mauritius 143 days compare

See the full ranking of 56 places →

More private sector data for Chad

All data for Chad →

Frequently asked questions

What is time required to deal with construction permits in Chad?
Time required to deal with construction permits in Chad was 154 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Chad?
The highest recorded value was 154 days in 2005.
What is the lowest time required to deal with construction permits recorded in Chad?
The lowest recorded value was 154 days in 2005.
How does Chad rank for time required to deal with construction permits?
Chad ranks 28th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Chad?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Chad data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.