Time required to deal with construction permits in Chad
Chad: Time required to deal with construction permits was 154 days in 2012. ▬ Flat
Time required to deal with construction permits in Chad, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
In 2012, time required to deal with construction permits in Chad stood at 154 days. That is the highest value across all 8 years on record.
The figure is unchanged over ten years.
That places Chad 28th out of 50 countries with data for 2012, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 154 days | 154 days | 154 days | 5 |
| 2010s | 154 days | 154 days | 154 days | 3 |
Countries ranked near Chad
More private sector data for Chad
- Merchandise trade 28.9% (2025)
- Food imports 24.3% (1995)
- Manufactures imports 56.5% (1995)
- Merchandise imports 2.20 billion current US$ (2025)
- Food exports 16.2% (1975)
- Manufactures exports 7.7% (1975)
- Merchandise exports 4.00 billion current US$ (2025)
- Commercial service exports 23.41 million current US$ (1994)
- Transport services 55.0% (1994)
- Computer, communications and other services 28.6% (1994)
Frequently asked questions
- What is time required to deal with construction permits in Chad?
- Time required to deal with construction permits in Chad was 154 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Chad?
- The highest recorded value was 154 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Chad?
- The lowest recorded value was 154 days in 2005.
- How does Chad rank for time required to deal with construction permits?
- Chad ranks 28th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Chad?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Chad data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.