Cote d'Ivoire vs Sub-Saharan Africa excluding South Africa and Nigeria: Time required to deal with construction permits
Cote d'Ivoire
475 days
in 2012
Sub-Saharan Africa excluding South Africa and Nigeria
200.26 days
in 2012
Cote d'Ivoire rank
2nd
Sub-Saharan Africa excluding South Africa and Nigeria rank
1st
Time required to deal with construction permits over time
- Cote d'Ivoire
- Sub-Saharan Africa excluding South Africa and Nigeria
How they compare
Cote d'Ivoire currently reports 475 days against 200.26 days in Sub-Saharan Africa excluding South Africa and Nigeria, a difference of 274.74 days.
That makes Cote d'Ivoire's figure about 2.4 times Sub-Saharan Africa excluding South Africa and Nigeria's.
Across all 8 years both countries report, Cote d'Ivoire has been ahead every year.
Cote d'Ivoire ranks 2nd and Sub-Saharan Africa excluding South Africa and Nigeria ranks 1st of 50 countries.
Cote d'Ivoire has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cote d'Ivoire | Sub-Saharan Africa excluding South Africa and Nigeria | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 534.2 days | 224.86 days | 309.34 days | Cote d'Ivoire |
| 2010s | 475 days | 203.32 days | 271.68 days | Cote d'Ivoire |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cote d'Ivoire or Sub-Saharan Africa excluding South Africa and Nigeria?
- Cote d'Ivoire, at 475 days against 200.26 days in Sub-Saharan Africa excluding South Africa and Nigeria as of 2012.
- What is the difference in time required to deal with construction permits between Cote d'Ivoire and Sub-Saharan Africa excluding South Africa and Nigeria?
- 274.74 days, with Cote d'Ivoire ahead.
- How many years of comparable data are there for Cote d'Ivoire and Sub-Saharan Africa excluding South Africa and Nigeria?
- 8 years are reported by both, from 2005 to 2012.
- How do Cote d'Ivoire and Sub-Saharan Africa excluding South Africa and Nigeria rank globally for time required to deal with construction permits?
- Cote d'Ivoire ranks 2nd and Sub-Saharan Africa excluding South Africa and Nigeria ranks 1st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.