Time required to deal with construction permits (days) in Cote d'Ivoire

Cote d'Ivoire: Time required to deal with construction permits (days) was 475 days in 2012. ▼ Falling

Latest (2012)
475 days
Change on year
unchanged
World rank
2nd
of 50 countries
All-time high
535 days
in 2009
All-time low
475 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Cote d'Ivoire, 2005–2012

02004006002005200820122005: 534 days2006: 534 days2007: 534 days2008: 534 days2009: 535 days2010: 475 days2011: 475 days2012: 475 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Cote d'Ivoire recorded 475 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

That represents a change of down 11.0% over ten years.

That places Cote d'Ivoire 2nd out of 50 countries with data for 2012, putting it in the top 10%.

Time required to deal with construction permits (days) in Cote d'Ivoire, year by year

Annual values for Time required to deal with construction permits (days) in Cote d'Ivoire, 2005 to 2012.
Year days Change
2005 534 days —
2006 534 days +0.0%
2007 534 days +0.0%
2008 534 days +0.0%
2009 535 days +0.2%
2010 475 days -11.2%
2011 475 days +0.0%
2012 475 days +0.0%

Cote d'Ivoire compared with similar countries

  • Cote d'Ivoire's 475 days is above the median for lower middle income countries, which is 196.5 days, 2.4× the median. (24 countries reporting)
  • Cote d'Ivoire's 475 days is above the median for Sub-Saharan Africa, which is 164 days, 2.9× the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 534.2 days 534 days 535 days 5
2010s 475 days 475 days 475 days 3

Countries ranked near Cote d'Ivoire

  1. 1 Zimbabwe 614 days compare
  2. 3 Mozambique 377 days compare
  3. 4 Angola 348 days compare
  4. 5 Lesotho 330 days compare

See the full ranking of 56 places →

More private sector data for Cote d'Ivoire

All data for Cote d'Ivoire →

Frequently asked questions

What is time required to deal with construction permits in Cote d'Ivoire?
Time required to deal with construction permits in Cote d'Ivoire was 475 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Cote d'Ivoire?
The highest recorded value was 535 days in 2009.
What is the lowest time required to deal with construction permits recorded in Cote d'Ivoire?
The lowest recorded value was 475 days in 2010.
How does Cote d'Ivoire rank for time required to deal with construction permits?
Cote d'Ivoire ranks 2nd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Cote d'Ivoire?
Over the last ten years it is down 11.0%. The long-run trend across the full record is falling.
Where does this Cote d'Ivoire data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Cote d'Ivoire. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/">Time required to deal with construction permits in Cote d'Ivoire</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.