Côte d'Ivoire vs Sub-Saharan Africa excluding South Africa: Time required to deal with construction permits
Côte d'Ivoire
475 days
in 2012
Sub-Saharan Africa excluding South Africa
197.64 days
in 2012
Côte d'Ivoire rank
2nd
Sub-Saharan Africa excluding South Africa rank
2nd
Time required to deal with construction permits over time
- Côte d'Ivoire
- Sub-Saharan Africa excluding South Africa
How they compare
Côte d'Ivoire currently reports 475 days against 197.64 days in Sub-Saharan Africa excluding South Africa, a difference of 277.36 days.
That makes Côte d'Ivoire's figure about 2.4 times Sub-Saharan Africa excluding South Africa's.
Across all 8 years both countries report, Côte d'Ivoire has been ahead every year.
Côte d'Ivoire ranks 2nd and Sub-Saharan Africa excluding South Africa ranks 2nd of 50 countries.
Côte d'Ivoire has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Côte d'Ivoire | Sub-Saharan Africa excluding South Africa | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 534.2 days | 225.93 days | 308.27 days | Côte d'Ivoire |
| 2010s | 475 days | 200.63 days | 274.37 days | Côte d'Ivoire |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Côte d'Ivoire or Sub-Saharan Africa excluding South Africa?
- Côte d'Ivoire, at 475 days against 197.64 days in Sub-Saharan Africa excluding South Africa as of 2012.
- What is the difference in time required to deal with construction permits between Côte d'Ivoire and Sub-Saharan Africa excluding South Africa?
- 277.36 days, with Côte d'Ivoire ahead.
- How many years of comparable data are there for Côte d'Ivoire and Sub-Saharan Africa excluding South Africa?
- 8 years are reported by both, from 2005 to 2012.
- How do Côte d'Ivoire and Sub-Saharan Africa excluding South Africa rank globally for time required to deal with construction permits?
- Côte d'Ivoire ranks 2nd and Sub-Saharan Africa excluding South Africa ranks 2nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.