Egypt vs Gabon: Time required to deal with construction permits

Egypt
218 days
in 2012
Gabon
243 days
in 2012
Egypt rank
13th
Gabon rank
11th

Time required to deal with construction permits over time

  • Egypt
  • Gabon
050100150200250200520082012

How they compare

Gabon currently reports 243 days against 218 days in Egypt, a difference of 25 days.

That makes Gabon's figure about 1.1 times Egypt's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Egypt ahead.

Egypt ranks 13th and Gabon ranks 11th of 50 countries.

Gabon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Egypt Gabon Difference Ahead
2000s 242.8 days 243 days 0.2 days Gabon
2010s 218 days 243 days 25 days Gabon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Egypt or Gabon?
Gabon, at 243 days against 218 days in Egypt as of 2012.
What is the difference in time required to deal with construction permits between Egypt and Gabon?
25 days, with Gabon ahead.
How many years of comparable data are there for Egypt and Gabon?
8 years are reported by both, from 2005 to 2012.
How do Egypt and Gabon rank globally for time required to deal with construction permits?
Egypt ranks 13th and Gabon ranks 11th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Egypt vs Gabon: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/egypt-arab-rep/gabon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/egypt-arab-rep/gabon/">Egypt vs Gabon: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.