Time required to deal with construction permits in Gabon
Gabon: Time required to deal with construction permits was 243 days in 2012. ▬ Flat
Time required to deal with construction permits in Gabon, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
The most recent figure for time required to deal with construction permits in Gabon is 243 days, measured in 2012. That is the highest value across all 8 years on record.
The figure is unchanged over ten years.
Gabon ranks 11th of 50 countries on this measure, in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 243 days | 243 days | 243 days | 5 |
| 2010s | 243 days | 243 days | 243 days | 3 |
Countries ranked near Gabon
More private sector data for Gabon
- Merchandise trade 72.8% (2025)
- Food imports 15.7% (2023)
- Manufactures imports 76.4% (2023)
- Merchandise imports 4.00 billion current US$ (2025)
- Food exports 0.9% (2023)
- Manufactures exports 17.8% (2023)
- Merchandise exports 11.60 billion current US$ (2025)
- Commercial service exports 273.34 million current US$ (2015)
- Transport services 31.2% (2015)
- Computer, communications and other services 50.6% (2015)
Frequently asked questions
- What is time required to deal with construction permits in Gabon?
- Time required to deal with construction permits in Gabon was 243 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Gabon?
- The highest recorded value was 243 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Gabon?
- The lowest recorded value was 243 days in 2005.
- How does Gabon rank for time required to deal with construction permits?
- Gabon ranks 11th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Gabon?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Gabon data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.