Time required to deal with construction permits in Gabon

Gabon: Time required to deal with construction permits was 243 days in 2012. ▬ Flat

Latest (2012)
243 days
Change on year
unchanged
World rank
11th
of 50 countries
All-time high
243 days
in 2005
All-time low
243 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Gabon, 2005–2012

0501001502002502005200820122005: 243 days2006: 243 days2007: 243 days2008: 243 days2009: 243 days2010: 243 days2011: 243 days2012: 243 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Gabon is 243 days, measured in 2012. That is the highest value across all 8 years on record.

The figure is unchanged over ten years.

Gabon ranks 11th of 50 countries on this measure, in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 243 days 243 days 243 days 5
2010s 243 days 243 days 243 days 3

Countries ranked near Gabon

  1. 8 Benin 282 days compare
  2. 9 Algeria 281 days compare
  3. 10 Sudan 270 days compare
  4. 12 Sierra Leone 238 days compare
  5. 13 Egypt, Arab Rep. 218 days compare
  6. 13 Ghana 218 days compare

See the full ranking of 56 places →

More private sector data for Gabon

All data for Gabon →

Frequently asked questions

What is time required to deal with construction permits in Gabon?
Time required to deal with construction permits in Gabon was 243 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Gabon?
The highest recorded value was 243 days in 2005.
What is the lowest time required to deal with construction permits recorded in Gabon?
The lowest recorded value was 243 days in 2005.
How does Gabon rank for time required to deal with construction permits?
Gabon ranks 11th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Gabon?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Gabon data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.