Egypt vs Ghana: Time required to deal with construction permits
Egypt
218 days
in 2012
Ghana
218 days
in 2012
Egypt rank
13th
Ghana rank
13th
Time required to deal with construction permits over time
- Egypt
- Ghana
How they compare
Egypt currently reports 218 days against 218 days in Ghana, a difference of 0 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Egypt ahead.
Egypt ranks 13th and Ghana ranks 13th of 50 countries.
Egypt has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Egypt | Ghana | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 242.8 days | 218 days | 24.8 days | Egypt |
| 2010s | 218 days | 218 days | 0 days | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Egypt or Ghana?
- Egypt, at 218 days against 218 days in Ghana as of 2012.
- What is the difference in time required to deal with construction permits between Egypt and Ghana?
- 0 days, with Egypt ahead.
- How many years of comparable data are there for Egypt and Ghana?
- 8 years are reported by both, from 2005 to 2012.
- How do Egypt and Ghana rank globally for time required to deal with construction permits?
- Egypt ranks 13th and Ghana ranks 13th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.