Time required to deal with construction permits in Ghana

Ghana: Time required to deal with construction permits was 218 days in 2012. ▬ Flat

Latest (2012)
218 days
Change on year
unchanged
World rank
13th
of 50 countries
All-time high
218 days
in 2005
All-time low
218 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Ghana, 2005–2012

0501001502002005200820122005: 218 days2006: 218 days2007: 218 days2008: 218 days2009: 218 days2010: 218 days2011: 218 days2012: 218 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Ghana is 218 days, measured in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Ghana 13th out of 50 countries with data for 2012, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 218 days 218 days 218 days 5
2010s 218 days 218 days 218 days 3

Countries ranked near Ghana

  1. 10 Sudan 270 days compare
  2. 11 Gabon 243 days compare
  3. 12 Sierra Leone 238 days compare
  4. 13 Egypt 218 days compare
  5. 15 Senegal 210 days compare
  6. 16 Tanzania 206 days compare

See the full ranking of 56 places →

More private sector data for Ghana

All data for Ghana →

Frequently asked questions

What is time required to deal with construction permits in Ghana?
Time required to deal with construction permits in Ghana was 218 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Ghana?
The highest recorded value was 218 days in 2005.
What is the lowest time required to deal with construction permits recorded in Ghana?
The lowest recorded value was 218 days in 2005.
How does Ghana rank for time required to deal with construction permits?
Ghana ranks 13th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Ghana?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Ghana data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.