Egypt vs Senegal: Time required to deal with construction permits
Egypt
218 days
in 2012
Senegal
210 days
in 2012
Egypt rank
13th
Senegal rank
15th
Time required to deal with construction permits over time
- Egypt
- Senegal
How they compare
Egypt currently reports 218 days against 210 days in Senegal, a difference of 8 days.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Egypt ahead.
Egypt ranks 13th and Senegal ranks 15th of 50 countries.
Egypt has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Egypt | Senegal | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 242.8 days | 220 days | 22.8 days | Egypt |
| 2010s | 218 days | 210 days | 8 days | Egypt |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Egypt or Senegal?
- Egypt, at 218 days against 210 days in Senegal as of 2012.
- What is the difference in time required to deal with construction permits between Egypt and Senegal?
- 8 days, with Egypt ahead.
- How many years of comparable data are there for Egypt and Senegal?
- 8 years are reported by both, from 2005 to 2012.
- How do Egypt and Senegal rank globally for time required to deal with construction permits?
- Egypt ranks 13th and Senegal ranks 15th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.