Time required to deal with construction permits in Senegal

Senegal: Time required to deal with construction permits was 210 days in 2012. ▼ Falling

Latest (2012)
210 days
Change on year
unchanged
World rank
15th
of 50 countries
All-time high
220 days
in 2005
All-time low
210 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Senegal, 2005–2012

0501001502002005200820122005: 220 days2006: 220 days2007: 220 days2008: 220 days2009: 220 days2010: 210 days2011: 210 days2012: 210 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Senegal recorded 210 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

That represents a change of down 4.5% over ten years.

That places Senegal 15th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 220 days 220 days 220 days 5
2010s 210 days 210 days 210 days 3

Countries ranked near Senegal

  1. 12 Sierra Leone 238 days compare
  2. 13 Egypt 218 days compare
  3. 13 Ghana 218 days compare
  4. 16 Tanzania 206 days compare
  5. 17 Central African Republic 203 days compare
  6. 18 Congo 201 days compare

See the full ranking of 56 places →

More private sector data for Senegal

All data for Senegal →

Frequently asked questions

What is time required to deal with construction permits in Senegal?
Time required to deal with construction permits in Senegal was 210 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Senegal?
The highest recorded value was 220 days in 2005.
What is the lowest time required to deal with construction permits recorded in Senegal?
The lowest recorded value was 210 days in 2010.
How does Senegal rank for time required to deal with construction permits?
Senegal ranks 15th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Senegal?
Over the last ten years it is down 4.5%. The long-run trend across the full record is falling.
Where does this Senegal data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.