Egypt vs Tanzania: Time required to deal with construction permits
Egypt
218 days
in 2012
Tanzania
206 days
in 2012
Egypt rank
13th
Tanzania rank
16th
Time required to deal with construction permits over time
- Egypt
- Tanzania
How they compare
Egypt currently reports 218 days against 206 days in Tanzania, a difference of 12 days.
That makes Egypt's figure about 1.1 times Tanzania's.
Across all 8 years both countries report, Egypt has been ahead every year.
Egypt ranks 13th and Tanzania ranks 16th of 50 countries.
Egypt has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Egypt | Tanzania | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 242.8 days | 190 days | 52.8 days | Egypt |
| 2010s | 218 days | 206 days | 12 days | Egypt |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Egypt or Tanzania?
- Egypt, at 218 days against 206 days in Tanzania as of 2012.
- What is the difference in time required to deal with construction permits between Egypt and Tanzania?
- 12 days, with Egypt ahead.
- How many years of comparable data are there for Egypt and Tanzania?
- 8 years are reported by both, from 2005 to 2012.
- How do Egypt and Tanzania rank globally for time required to deal with construction permits?
- Egypt ranks 13th and Tanzania ranks 16th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.