Ethiopia vs Uganda: Time required to deal with construction permits
Ethiopia
128 days
in 2012
Uganda
125 days
in 2012
Ethiopia rank
35th
Uganda rank
38th
Time required to deal with construction permits over time
- Ethiopia
- Uganda
How they compare
Ethiopia currently reports 128 days against 125 days in Uganda, a difference of 3 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Uganda ahead.
Ethiopia ranks 35th and Uganda ranks 38th of 50 countries.
Across the 2 decades both report, Ethiopia averaged higher in 1 and Uganda in 1.
Head to head by decade
| Decade | Ethiopia | Uganda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 128 days | 129 days | 1 days | Uganda |
| 2010s | 128 days | 125 days | 3 days | Ethiopia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Ethiopia or Uganda?
- Ethiopia, at 128 days against 125 days in Uganda as of 2012.
- What is the difference in time required to deal with construction permits between Ethiopia and Uganda?
- 3 days, with Ethiopia ahead.
- How many years of comparable data are there for Ethiopia and Uganda?
- 8 years are reported by both, from 2005 to 2012.
- How do Ethiopia and Uganda rank globally for time required to deal with construction permits?
- Ethiopia ranks 35th and Uganda ranks 38th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.