Ethiopia vs Uganda: Time required to deal with construction permits

Ethiopia
128 days
in 2012
Uganda
125 days
in 2012
Ethiopia rank
35th
Uganda rank
38th

Time required to deal with construction permits over time

  • Ethiopia
  • Uganda
050100150200520082012

How they compare

Ethiopia currently reports 128 days against 125 days in Uganda, a difference of 3 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Uganda ahead.

Ethiopia ranks 35th and Uganda ranks 38th of 50 countries.

Across the 2 decades both report, Ethiopia averaged higher in 1 and Uganda in 1.

Head to head by decade

Decade Ethiopia Uganda Difference Ahead
2000s 128 days 129 days 1 days Uganda
2010s 128 days 125 days 3 days Ethiopia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Ethiopia or Uganda?
Ethiopia, at 128 days against 125 days in Uganda as of 2012.
What is the difference in time required to deal with construction permits between Ethiopia and Uganda?
3 days, with Ethiopia ahead.
How many years of comparable data are there for Ethiopia and Uganda?
8 years are reported by both, from 2005 to 2012.
How do Ethiopia and Uganda rank globally for time required to deal with construction permits?
Ethiopia ranks 35th and Uganda ranks 38th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ethiopia vs Uganda: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/ethiopia/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/ethiopia/uganda/">Ethiopia vs Uganda: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.