Time required to deal with construction permits in Ethiopia

Ethiopia: Time required to deal with construction permits was 128 days in 2012. ▬ Flat

Latest (2012)
128 days
Change on year
unchanged
World rank
35th
of 50 countries
All-time high
128 days
in 2005
All-time low
128 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Ethiopia, 2005–2012

0501001502005200820122005: 128 days2006: 128 days2007: 128 days2008: 128 days2009: 128 days2010: 128 days2011: 128 days2012: 128 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Ethiopia stood at 128 days. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

Ethiopia ranks 35th of 50 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 128 days 128 days 128 days 5
2010s 128 days 128 days 128 days 3

Countries ranked near Ethiopia

  1. 34 Namibia 139 days compare
  2. 36 South Africa 127 days compare
  3. 37 Seychelles 126 days compare
  4. 38 Kenya 125 days compare
  5. 38 Uganda 125 days compare

See the full ranking of 56 places →

More private sector data for Ethiopia

All data for Ethiopia →

Frequently asked questions

What is time required to deal with construction permits in Ethiopia?
Time required to deal with construction permits in Ethiopia was 128 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Ethiopia?
The highest recorded value was 128 days in 2005.
What is the lowest time required to deal with construction permits recorded in Ethiopia?
The lowest recorded value was 128 days in 2005.
How does Ethiopia rank for time required to deal with construction permits?
Ethiopia ranks 35th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Ethiopia?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Ethiopia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.