Kenya vs Uganda: Time required to deal with construction permits
Kenya
125 days
in 2012
Uganda
125 days
in 2012
Kenya rank
38th
Uganda rank
38th
Time required to deal with construction permits over time
- Kenya
- Uganda
How they compare
Kenya currently reports 125 days against 125 days in Uganda, a difference of 0 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Kenya ahead.
Kenya ranks 38th and Uganda ranks 38th of 50 countries.
Kenya has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Kenya | Uganda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 137.2 days | 129 days | 8.2 days | Kenya |
| 2010s | 125 days | 125 days | 0 days | β |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Kenya or Uganda?
- Kenya, at 125 days against 125 days in Uganda as of 2012.
- What is the difference in time required to deal with construction permits between Kenya and Uganda?
- 0 days, with Kenya ahead.
- How many years of comparable data are there for Kenya and Uganda?
- 8 years are reported by both, from 2005 to 2012.
- How do Kenya and Uganda rank globally for time required to deal with construction permits?
- Kenya ranks 38th and Uganda ranks 38th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.