Lesotho vs North Africa: Time required to deal with construction permits

Lesotho
330 days
in 2012
North Africa
171.2 days
in 2012
Lesotho rank
5th
North Africa rank
6th

Time required to deal with construction permits over time

  • Lesotho
  • North Africa
0100200300400200520082012

How they compare

Lesotho currently reports 330 days against 171.2 days in North Africa, a difference of 158.8 days.

That makes Lesotho's figure about 1.9 times North Africa's.

Across all 8 years both countries report, Lesotho has been ahead every year.

Lesotho ranks 5th and North Africa ranks 6th of 50 countries.

Lesotho has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lesotho North Africa Difference Ahead
2000s 401.2 days 177.84 days 223.36 days Lesotho
2010s 330 days 171.6 days 158.4 days Lesotho

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Lesotho or North Africa?
Lesotho, at 330 days against 171.2 days in North Africa as of 2012.
What is the difference in time required to deal with construction permits between Lesotho and North Africa?
158.8 days, with Lesotho ahead.
How many years of comparable data are there for Lesotho and North Africa?
8 years are reported by both, from 2005 to 2012.
How do Lesotho and North Africa rank globally for time required to deal with construction permits?
Lesotho ranks 5th and North Africa ranks 6th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lesotho vs North Africa: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/lesotho/north-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/lesotho/north-africa/">Lesotho vs North Africa: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.