Time required to deal with construction permits in Lesotho

Lesotho: Time required to deal with construction permits was 330 days in 2012. ▼ Falling

Latest (2012)
330 days
Change on year
unchanged
World rank
5th
of 50 countries
All-time high
419 days
in 2005
All-time low
330 days
in 2009
Years of data
8
2005–2012

Time required to deal with construction permits in Lesotho, 2005–2012

01002003004002005200820122005: 419 days2006: 419 days2007: 419 days2008: 419 days2009: 330 days2010: 330 days2011: 330 days2012: 330 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Lesotho stood at 330 days. That is the lowest value across all 8 years on record.

That represents a change of down 21.2% over ten years.

That places Lesotho 5th out of 50 countries with data for 2012, putting it in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 401.2 days 330 days 419 days 5
2010s 330 days 330 days 330 days 3

Countries ranked near Lesotho

  1. 2 Cote d'Ivoire 475 days compare
  2. 3 Mozambique 377 days compare
  3. 4 Angola 348 days compare
  4. 6 Niger 326 days compare
  5. 7 Togo 309 days compare
  6. 8 Benin 282 days compare

See the full ranking of 56 places →

More private sector data for Lesotho

All data for Lesotho →

Frequently asked questions

What is time required to deal with construction permits in Lesotho?
Time required to deal with construction permits in Lesotho was 330 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Lesotho?
The highest recorded value was 419 days in 2005.
What is the lowest time required to deal with construction permits recorded in Lesotho?
The lowest recorded value was 330 days in 2009.
How does Lesotho rank for time required to deal with construction permits?
Lesotho ranks 5th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Lesotho?
Over the last ten years it is down 21.2%. The long-run trend across the full record is falling.
Where does this Lesotho data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.