Mozambique vs Sub-Saharan Africa excluding South Africa: Time required to deal with construction permits

Mozambique
377 days
in 2012
Sub-Saharan Africa excluding South Africa
197.64 days
in 2012
Mozambique rank
3rd
Sub-Saharan Africa excluding South Africa rank
2nd

Time required to deal with construction permits over time

  • Mozambique
  • Sub-Saharan Africa excluding South Africa
0100200300400200520082012

How they compare

Mozambique currently reports 377 days against 197.64 days in Sub-Saharan Africa excluding South Africa, a difference of 179.36 days.

That makes Mozambique's figure about 1.9 times Sub-Saharan Africa excluding South Africa's.

Across all 8 years both countries report, Mozambique has been ahead every year.

Mozambique ranks 3rd and Sub-Saharan Africa excluding South Africa ranks 2nd of 50 countries.

Mozambique has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mozambique Sub-Saharan Africa excluding South Africa Difference Ahead
2000s 377 days 225.93 days 151.07 days Mozambique
2010s 377 days 200.63 days 176.37 days Mozambique

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Mozambique or Sub-Saharan Africa excluding South Africa?
Mozambique, at 377 days against 197.64 days in Sub-Saharan Africa excluding South Africa as of 2012.
What is the difference in time required to deal with construction permits between Mozambique and Sub-Saharan Africa excluding South Africa?
179.36 days, with Mozambique ahead.
How many years of comparable data are there for Mozambique and Sub-Saharan Africa excluding South Africa?
8 years are reported by both, from 2005 to 2012.
How do Mozambique and Sub-Saharan Africa excluding South Africa rank globally for time required to deal with construction permits?
Mozambique ranks 3rd and Sub-Saharan Africa excluding South Africa ranks 2nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mozambique vs Sub-Saharan Africa excluding South Africa: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 13 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mozambique/sub-saharan-africa-excluding-south-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mozambique/sub-saharan-africa-excluding-south-africa/">Mozambique vs Sub-Saharan Africa excluding South Africa: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.