Time required to deal with construction permits in Mozambique

Mozambique: Time required to deal with construction permits was 377 days in 2012. ▬ Flat

Latest (2012)
377 days
Change on year
unchanged
World rank
3rd
of 50 countries
All-time high
377 days
in 2005
All-time low
377 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Mozambique, 2005–2012

01002003004002005200820122005: 377 days2006: 377 days2007: 377 days2008: 377 days2009: 377 days2010: 377 days2011: 377 days2012: 377 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Mozambique is 377 days, measured in 2012. That is the highest value across all 8 years on record.

That represents a change of unchanged over ten years.

That places Mozambique 3rd out of 50 countries with data for 2012, putting it in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 377 days 377 days 377 days 5
2010s 377 days 377 days 377 days 3

Countries ranked near Mozambique

  1. 1 Zimbabwe 614 days compare
  2. 2 Cote d'Ivoire 475 days compare
  3. 4 Angola 348 days compare
  4. 5 Lesotho 330 days compare
  5. 6 Niger 326 days compare

See the full ranking of 56 places →

More private sector data for Mozambique

All data for Mozambique →

Frequently asked questions

What is time required to deal with construction permits in Mozambique?
Time required to deal with construction permits in Mozambique was 377 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Mozambique?
The highest recorded value was 377 days in 2005.
What is the lowest time required to deal with construction permits recorded in Mozambique?
The lowest recorded value was 377 days in 2005.
How does Mozambique rank for time required to deal with construction permits?
Mozambique ranks 3rd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Mozambique?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Mozambique data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.