Sao Tome and Principe vs Uganda: Time required to deal with construction permits

Sao Tome and Principe
118 days
in 2012
Uganda
125 days
in 2012
Sao Tome and Principe rank
41st
Uganda rank
38th

Time required to deal with construction permits over time

  • Sao Tome and Principe
  • Uganda
0100200300200520082012

How they compare

Uganda currently reports 125 days against 118 days in Sao Tome and Principe, a difference of 7 days.

That makes Uganda's figure about 1.1 times Sao Tome and Principe's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Sao Tome and Principe ahead.

Sao Tome and Principe ranks 41st and Uganda ranks 38th of 50 countries.

Sao Tome and Principe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sao Tome and Principe Uganda Difference Ahead
2000s 255 days 129 days 126 days Sao Tome and Principe
2010s 163.67 days 125 days 38.67 days Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Sao Tome and Principe or Uganda?
Uganda, at 125 days against 118 days in Sao Tome and Principe as of 2012.
What is the difference in time required to deal with construction permits between Sao Tome and Principe and Uganda?
7 days, with Uganda ahead.
How many years of comparable data are there for Sao Tome and Principe and Uganda?
8 years are reported by both, from 2005 to 2012.
How do Sao Tome and Principe and Uganda rank globally for time required to deal with construction permits?
Sao Tome and Principe ranks 41st and Uganda ranks 38th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sao Tome and Principe vs Uganda: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 05 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sao-tome-and-principe/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sao-tome-and-principe/uganda/">Sao Tome and Principe vs Uganda: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.