Time required to deal with construction permits in Sao Tome and Principe

Sao Tome and Principe: Time required to deal with construction permits was 118 days in 2012. ▼ Falling

Latest (2012)
118 days
Change on year
unchanged
World rank
41st
of 50 countries
All-time high
255 days
in 2005
All-time low
118 days
in 2011
Years of data
8
2005–2012

Time required to deal with construction permits in Sao Tome and Principe, 2005–2012

01002003002005200820122005: 255 days2006: 255 days2007: 255 days2008: 255 days2009: 255 days2010: 255 days2011: 118 days2012: 118 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Sao Tome and Principe recorded 118 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

That represents a change of down 53.7% over ten years.

That places Sao Tome and Principe 41st out of 50 countries with data for 2012, putting it in the bottom quarter.

Time required to deal with construction permits in Sao Tome and Principe, year by year

Annual values for Time required to deal with construction permits (days) in Sao Tome and Principe, 2005 to 2012.
Year days Change
2005 255 days
2006 255 days +0.0%
2007 255 days +0.0%
2008 255 days +0.0%
2009 255 days +0.0%
2010 255 days +0.0%
2011 118 days -53.7%
2012 118 days +0.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 255 days 255 days 255 days 5
2010s 163.67 days 118 days 255 days 3

Countries ranked near Sao Tome and Principe

  1. 38 Kenya 125 days compare
  2. 38 Uganda 125 days compare
  3. 40 Cape Verde 122 days compare
  4. 42 Congo, Democratic Republic of the 117 days compare
  5. 43 Burundi 99 days compare
  6. 44 Burkina Faso 98 days compare

See the full ranking of 56 places →

More private sector data for Sao Tome and Principe

All data for Sao Tome and Principe →

Frequently asked questions

What is time required to deal with construction permits in Sao Tome and Principe?
Time required to deal with construction permits in Sao Tome and Principe was 118 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Sao Tome and Principe?
The highest recorded value was 255 days in 2005.
What is the lowest time required to deal with construction permits recorded in Sao Tome and Principe?
The lowest recorded value was 118 days in 2011.
How does Sao Tome and Principe rank for time required to deal with construction permits?
Sao Tome and Principe ranks 41st out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Sao Tome and Principe?
Over the last ten years it is down 53.7%. The long-run trend across the full record is falling.
Where does this Sao Tome and Principe data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Sao Tome and Principe. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 29 August 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/sao-tome-and-principe/">Time required to deal with construction permits in Sao Tome and Principe</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.