Seychelles vs South Africa: Time required to deal with construction permits

Seychelles
126 days
in 2012
South Africa
127 days
in 2012
Seychelles rank
37th
South Africa rank
36th

Time required to deal with construction permits over time

  • Seychelles
  • South Africa
050100150200520082012

How they compare

South Africa currently reports 127 days against 126 days in Seychelles, a difference of 1 days.

Across all 8 years both countries report, South Africa has been ahead every year.

Seychelles ranks 37th and South Africa ranks 36th of 50 countries.

South Africa has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Seychelles South Africa Difference Ahead
2000s 126 days 127 days 1 days South Africa
2010s 126.33 days 127 days 0.6667 days South Africa

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Seychelles or South Africa?
South Africa, at 127 days against 126 days in Seychelles as of 2012.
What is the difference in time required to deal with construction permits between Seychelles and South Africa?
1 days, with South Africa ahead.
How many years of comparable data are there for Seychelles and South Africa?
8 years are reported by both, from 2005 to 2012.
How do Seychelles and South Africa rank globally for time required to deal with construction permits?
Seychelles ranks 37th and South Africa ranks 36th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Seychelles vs South Africa: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/seychelles/south-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/seychelles/south-africa/">Seychelles vs South Africa: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.