Time required to deal with construction permits in Seychelles

Seychelles: Time required to deal with construction permits was 126 days in 2012. ▬ Flat

Latest (2012)
126 days
Change on year
unchanged
World rank
37th
of 50 countries
All-time high
127 days
in 2010
All-time low
126 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Seychelles, 2005–2012

0501001502005200820122005: 126 days2006: 126 days2007: 126 days2008: 126 days2009: 126 days2010: 127 days2011: 126 days2012: 126 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Seychelles recorded 126 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

The figure is unchanged over ten years.

That places Seychelles 37th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 126 days 126 days 126 days 5
2010s 126.33 days 126 days 127 days 3

Countries ranked near Seychelles

  1. 34 Namibia 139 days compare
  2. 35 Ethiopia 128 days compare
  3. 36 South Africa 127 days compare
  4. 38 Kenya 125 days compare
  5. 38 Uganda 125 days compare
  6. 40 Cape Verde 122 days compare

See the full ranking of 56 places →

More private sector data for Seychelles

All data for Seychelles →

Frequently asked questions

What is time required to deal with construction permits in Seychelles?
Time required to deal with construction permits in Seychelles was 126 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Seychelles?
The highest recorded value was 127 days in 2010.
What is the lowest time required to deal with construction permits recorded in Seychelles?
The lowest recorded value was 126 days in 2005.
How does Seychelles rank for time required to deal with construction permits?
Seychelles ranks 37th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Seychelles?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Seychelles data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.