Time required to deal with construction permits (days) in Seychelles

Seychelles: Time required to deal with construction permits (days) was 126 days in 2012. ▬ Flat

Latest (2012)
126 days
Change on year
unchanged
World rank
37th
of 50 countries
All-time high
127 days
in 2010
All-time low
126 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Seychelles, 2005–2012

0501001502005200820122005: 126 days2006: 126 days2007: 126 days2008: 126 days2009: 126 days2010: 127 days2011: 126 days2012: 126 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Seychelles recorded 126 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

The figure is unchanged over ten years.

That places Seychelles 37th out of 50 countries with data for 2012, putting it in the middle of the range.

Time required to deal with construction permits (days) in Seychelles, year by year

Annual values for Time required to deal with construction permits (days) in Seychelles, 2005 to 2012.
Year days Change
2005 126 days —
2006 126 days +0.0%
2007 126 days +0.0%
2008 126 days +0.0%
2009 126 days +0.0%
2010 127 days +0.8%
2011 126 days -0.8%
2012 126 days +0.0%

Seychelles compared with similar countries

  • Seychelles's 126 days is below the median for Sub-Saharan Africa, which is 164 days, 77% of the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 126 days 126 days 126 days 5
2010s 126.33 days 126 days 127 days 3

Countries ranked near Seychelles

  1. 34 Namibia 139 days compare
  2. 35 Ethiopia 128 days compare
  3. 36 South Africa 127 days compare
  4. 38 Kenya 125 days compare
  5. 38 Uganda 125 days compare
  6. 40 Cape Verde 122 days compare

See the full ranking of 56 places →

More private sector data for Seychelles

All data for Seychelles →

Frequently asked questions

What is time required to deal with construction permits in Seychelles?
Time required to deal with construction permits in Seychelles was 126 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Seychelles?
The highest recorded value was 127 days in 2010.
What is the lowest time required to deal with construction permits recorded in Seychelles?
The lowest recorded value was 126 days in 2005.
How does Seychelles rank for time required to deal with construction permits?
Seychelles ranks 37th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Seychelles?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Seychelles data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Seychelles. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/seychelles/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/seychelles/">Time required to deal with construction permits in Seychelles</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.