Sub-Saharan Africa excluding South Africa vs Zimbabwe: Time required to deal with construction permits

Sub-Saharan Africa excluding South Africa
197.64 days
in 2012
Zimbabwe
614 days
in 2012
Sub-Saharan Africa excluding South Africa rank
2nd
Zimbabwe rank
1st

Time required to deal with construction permits over time

  • Sub-Saharan Africa excluding South Africa
  • Zimbabwe
200300400500600200520082012

How they compare

Zimbabwe currently reports 614 days against 197.64 days in Sub-Saharan Africa excluding South Africa, a difference of 416.36 days.

That makes Zimbabwe's figure about 3.1 times Sub-Saharan Africa excluding South Africa's.

Across all 8 years both countries report, Zimbabwe has been ahead every year.

Sub-Saharan Africa excluding South Africa ranks 2nd and Zimbabwe ranks 1st of 6 groups.

Zimbabwe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sub-Saharan Africa excluding South Africa Zimbabwe Difference Ahead
2000s 225.93 days 482.8 days 256.87 days Zimbabwe
2010s 200.63 days 614 days 413.37 days Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Sub-Saharan Africa excluding South Africa or Zimbabwe?
Zimbabwe, at 614 days against 197.64 days in Sub-Saharan Africa excluding South Africa as of 2012.
What is the difference in time required to deal with construction permits between Sub-Saharan Africa excluding South Africa and Zimbabwe?
416.36 days, with Zimbabwe ahead.
How many years of comparable data are there for Sub-Saharan Africa excluding South Africa and Zimbabwe?
8 years are reported by both, from 2005 to 2012.
How do Sub-Saharan Africa excluding South Africa and Zimbabwe rank globally for time required to deal with construction permits?
Sub-Saharan Africa excluding South Africa ranks 2nd and Zimbabwe ranks 1st of 6 groups.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sub-Saharan Africa excluding South Africa vs Zimbabwe: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 12 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sub-saharan-africa-excluding-south-africa/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sub-saharan-africa-excluding-south-africa/zimbabwe/">Sub-Saharan Africa excluding South Africa vs Zimbabwe: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.