Time required to deal with construction permits in Zimbabwe

Zimbabwe: Time required to deal with construction permits was 614 days in 2012. ▲ Rising

Latest (2012)
614 days
Change on year
unchanged
World rank
1st
of 50 countries
All-time high
614 days
in 2008
All-time low
333 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Zimbabwe, 2005–2012

02004006002005200820122005: 333 days2006: 333 days2007: 520 days2008: 614 days2009: 614 days2010: 614 days2011: 614 days2012: 614 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Zimbabwe is 614 days, measured in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is up 84.4% over ten years.

That places Zimbabwe 1st out of 50 countries with data for 2012, putting it in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 482.8 days 333 days 614 days 5
2010s 614 days 614 days 614 days 3

Countries ranked near Zimbabwe

  1. 2 Cote d'Ivoire 475 days compare
  2. 3 Mozambique 377 days compare
  3. 4 Angola 348 days compare

See the full ranking of 56 places →

More private sector data for Zimbabwe

All data for Zimbabwe →

Frequently asked questions

What is time required to deal with construction permits in Zimbabwe?
Time required to deal with construction permits in Zimbabwe was 614 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Zimbabwe?
The highest recorded value was 614 days in 2008.
What is the lowest time required to deal with construction permits recorded in Zimbabwe?
The lowest recorded value was 333 days in 2005.
How does Zimbabwe rank for time required to deal with construction permits?
Zimbabwe ranks 1st out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Zimbabwe?
Over the last ten years it is up 84.4%. The long-run trend across the full record is rising.
Where does this Zimbabwe data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.