Dealing with construction permits: Building quality control index in Egypt

Egypt: Dealing with construction permits: Building quality control index was 14 DB16-20 methodology in 2019. β–¬ Flat

Latest (2019)
14 DB16-20 methodology
Change on year
unchanged
World rank
8th
of 185 countries
All-time high
14 DB16-20 methodology
in 2014
All-time low
14 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index in Egypt, 2014–2019

0510152014201620192014: 14 DB16-20 methodology2015: 14 DB16-20 methodology2016: 14 DB16-20 methodology2017: 14 DB16-20 methodology2018: 14 DB16-20 methodology2019: 14 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: building quality control index in Egypt is 14 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

The figure is unchanged over ten years.

Egypt ranks 8th of 185 countries on this measure, in the top 10%.

Countries ranked near Egypt

  1. 7 India 14.53 DB16-20 methodology compare
  2. 8 Russian Federation 14 DB16-20 methodology compare
  3. 8 Australia 14 DB16-20 methodology compare
  4. 8 Bulgaria 14 DB16-20 methodology compare
  5. 8 Canada 14 DB16-20 methodology compare
  6. 8 Israel 14 DB16-20 methodology compare
  7. 8 Kuwait 14 DB16-20 methodology compare
  8. 8 Lebanon 14 DB16-20 methodology compare
  9. 8 Malta 14 DB16-20 methodology compare
  10. 8 Mauritius 14 DB16-20 methodology compare
  11. 8 Mongolia 14 DB16-20 methodology compare
  12. 8 Serbia 14 DB16-20 methodology compare
  13. 8 Tunisia 14 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Egypt

All data for Egypt β†’

Frequently asked questions

What is dealing with construction permits: building quality control index in Egypt?
Dealing with construction permits: building quality control index in Egypt was 14 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index recorded in Egypt?
The highest recorded value was 14 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: building quality control index recorded in Egypt?
The lowest recorded value was 14 DB16-20 methodology in 2014.
How does Egypt rank for dealing with construction permits: building quality control index?
Egypt ranks 8th out of 185 countries with data for 2019.
Is dealing with construction permits: building quality control index rising or falling in Egypt?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Egypt data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Building quality control index in Egypt. Statizoid. Retrieved 20 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/egypt-arab-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/egypt-arab-rep/">Dealing with construction permits: Building quality control index in Egypt</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.