Dealing with construction permits: Building quality control index in Tunisia

Tunisia: Dealing with construction permits: Building quality control index was 14 DB16-20 methodology in 2019. β–² Rising

Latest (2019)
14 DB16-20 methodology
Change on year
unchanged
World rank
8th
of 185 countries
All-time high
14 DB16-20 methodology
in 2018
All-time low
12 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index in Tunisia, 2014–2019

0510152014201620192014: 12 DB16-20 methodology2015: 12 DB16-20 methodology2016: 12 DB16-20 methodology2017: 12 DB16-20 methodology2018: 14 DB16-20 methodology2019: 14 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: building quality control index in Tunisia is 14 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

That represents a change of up 16.7% over ten years.

Tunisia ranks 8th of 185 countries on this measure, in the top 10%.

Countries ranked near Tunisia

  1. 7 India 14.53 DB16-20 methodology compare
  2. 8 Russia 14 DB16-20 methodology compare
  3. 8 Australia 14 DB16-20 methodology compare
  4. 8 Bulgaria 14 DB16-20 methodology compare
  5. 8 Canada 14 DB16-20 methodology compare
  6. 8 Egypt 14 DB16-20 methodology compare
  7. 8 Israel 14 DB16-20 methodology compare
  8. 8 Kuwait 14 DB16-20 methodology compare
  9. 8 Lebanon 14 DB16-20 methodology compare
  10. 8 Malta 14 DB16-20 methodology compare
  11. 8 Mauritius 14 DB16-20 methodology compare
  12. 8 Mongolia 14 DB16-20 methodology compare
  13. 8 Serbia 14 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Tunisia

All data for Tunisia β†’

Frequently asked questions

What is dealing with construction permits: building quality control index in Tunisia?
Dealing with construction permits: building quality control index in Tunisia was 14 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index recorded in Tunisia?
The highest recorded value was 14 DB16-20 methodology in 2018.
What is the lowest dealing with construction permits: building quality control index recorded in Tunisia?
The lowest recorded value was 12 DB16-20 methodology in 2014.
How does Tunisia rank for dealing with construction permits: building quality control index?
Tunisia ranks 8th out of 185 countries with data for 2019.
Is dealing with construction permits: building quality control index rising or falling in Tunisia?
Over the last ten years it is up 16.7%. The long-run trend across the full record is rising.
Where does this Tunisia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Building quality control index in Tunisia. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/tunisia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/tunisia/">Dealing with construction permits: Building quality control index in Tunisia</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.