Dealing with construction permits: Building quality control index in Malaysia

Malaysia: Dealing with construction permits: Building quality control index was 13 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
13 DB16-20 methodology
Change on year
unchanged
World rank
23rd
of 185 countries
All-time high
13 DB16-20 methodology
in 2014
All-time low
13 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index in Malaysia, 2014–2019

0510152014201620192014: 13 DB16-20 methodology2015: 13 DB16-20 methodology2016: 13 DB16-20 methodology2017: 13 DB16-20 methodology2018: 13 DB16-20 methodology2019: 13 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: building quality control index in Malaysia is 13 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

That represents a change of unchanged over ten years.

Malaysia ranks 23rd of 185 countries on this measure, in the top quarter.

Countries ranked near Malaysia

  1. 21 Indonesia 13.78 DB16-20 methodology compare
  2. 22 Iran 13.5 DB16-20 methodology compare
  3. 23 Japan 13 DB16-20 methodology compare
  4. 23 Albania 13 DB16-20 methodology compare
  5. 23 Austria 13 DB16-20 methodology compare
  6. 23 Belarus 13 DB16-20 methodology compare
  7. 23 Bosnia and Herzegovina 13 DB16-20 methodology compare
  8. 23 Cameroon 13 DB16-20 methodology compare
  9. 23 Chile 13 DB16-20 methodology compare
  10. 23 Dominican Republic 13 DB16-20 methodology compare
  11. 23 France 13 DB16-20 methodology compare
  12. 23 Hungary 13 DB16-20 methodology compare
  13. 23 Ireland 13 DB16-20 methodology compare
  14. 23 Kazakhstan 13 DB16-20 methodology compare
  15. 23 Lithuania 13 DB16-20 methodology compare
  16. 23 Morocco 13 DB16-20 methodology compare
  17. 23 North Macedonia 13 DB16-20 methodology compare
  18. 23 Peru 13 DB16-20 methodology compare
  19. 23 Philippines 13 DB16-20 methodology compare
  20. 23 Qatar 13 DB16-20 methodology compare
  21. 23 Romania 13 DB16-20 methodology compare
  22. 23 San Marino 13 DB16-20 methodology compare
  23. 23 Singapore 13 DB16-20 methodology compare
  24. 23 Slovenia 13 DB16-20 methodology compare
  25. 23 Taiwan 13 DB16-20 methodology compare
  26. 23 Türkiye 13 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Malaysia

All data for Malaysia →

Frequently asked questions

What is dealing with construction permits: building quality control index in Malaysia?
Dealing with construction permits: building quality control index in Malaysia was 13 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index recorded in Malaysia?
The highest recorded value was 13 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: building quality control index recorded in Malaysia?
The lowest recorded value was 13 DB16-20 methodology in 2014.
How does Malaysia rank for dealing with construction permits: building quality control index?
Malaysia ranks 23rd out of 185 countries with data for 2019.
Is dealing with construction permits: building quality control index rising or falling in Malaysia?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Malaysia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Building quality control index in Malaysia. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/malaysia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/malaysia/">Dealing with construction permits: Building quality control index in Malaysia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.