Dealing with construction permits: Building quality control index in Taiwan
Taiwan: Dealing with construction permits: Building quality control index was 13 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Building quality control index in Taiwan, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: building quality control index in Taiwan stood at 13 DB16-20 methodology. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
That places Taiwan 23rd out of 185 countries with data for 2019, putting it in the top quarter.
Countries ranked near Taiwan
- 21 Indonesia 13.78 DB16-20 methodology compare
- 22 Iran 13.5 DB16-20 methodology compare
- 23 Japan 13 DB16-20 methodology compare
- 23 Albania 13 DB16-20 methodology compare
- 23 Austria 13 DB16-20 methodology compare
- 23 Belarus 13 DB16-20 methodology compare
- 23 Bosnia and Herzegovina 13 DB16-20 methodology compare
- 23 Cameroon 13 DB16-20 methodology compare
- 23 Chile 13 DB16-20 methodology compare
- 23 Dominican Republic 13 DB16-20 methodology compare
- 23 France 13 DB16-20 methodology compare
- 23 Hungary 13 DB16-20 methodology compare
- 23 Ireland 13 DB16-20 methodology compare
- 23 Kazakhstan 13 DB16-20 methodology compare
- 23 Lithuania 13 DB16-20 methodology compare
- 23 Malaysia 13 DB16-20 methodology compare
- 23 Morocco 13 DB16-20 methodology compare
- 23 North Macedonia 13 DB16-20 methodology compare
- 23 Peru 13 DB16-20 methodology compare
- 23 Philippines 13 DB16-20 methodology compare
- 23 Qatar 13 DB16-20 methodology compare
- 23 Romania 13 DB16-20 methodology compare
- 23 San Marino 13 DB16-20 methodology compare
- 23 Singapore 13 DB16-20 methodology compare
- 23 Slovenia 13 DB16-20 methodology compare
- 23 Türkiye 13 DB16-20 methodology compare
More private sector data for Taiwan
- Starting a business: Paid-in Minimum capital (% of income per capita) 100.0% (2019)
- Starting a business: Minimum capital 0.0% (2019)
- Starting a business: Cost - Women (% of income per capita) - Score 99.1% (2019)
- Starting a business: Cost - Men (% of income per capita) - Score 99.1% (2019)
- Starting a business: Time - Women 10 days (2019)
- Starting a business: Time - Women (days)- Score 90.45 (2019)
- Starting a business: Time - Men 10 days (2019)
- Starting a business: Time - Men (days) - Score 90.45 (2019)
- Starting a business: Procedures required - Women 3 number (2019)
- Starting a business: Procedures required - Women (number) - Score 88.24 (2019)
Frequently asked questions
- What is dealing with construction permits: building quality control index in Taiwan?
- Dealing with construction permits: building quality control index in Taiwan was 13 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: building quality control index recorded in Taiwan?
- The highest recorded value was 13 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: building quality control index recorded in Taiwan?
- The lowest recorded value was 13 DB16-20 methodology in 2014.
- How does Taiwan rank for dealing with construction permits: building quality control index?
- Taiwan ranks 23rd out of 185 countries with data for 2019.
- Is dealing with construction permits: building quality control index rising or falling in Taiwan?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Taiwan data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.