Dealing with construction permits, cost in Algeria

Algeria: Dealing with construction permits, cost was 54.6% in 2012. ▲ Rising

Latest (2012)
54.6%
Change on year
down 11.1%
World rank
47th
of 50 countries
All-time high
69.0%
in 2010
All-time low
23.4%
in 2009
Years of data
8
2005–2012

Dealing with construction permits, cost in Algeria, 2005–2012

2030405060702005200820122005: 41.6 % of income per capita2006: 34.7 % of income per capita2007: 34.1 % of income per capita2008: 27.6 % of income per capita2009: 23.4 % of income per capita2010: 69 % of income per capita2011: 61.4 % of income per capita2012: 54.6 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Algeria stood at 54.6%.

That represents a change of down 11.1% on the previous year and up 31.2% over ten years.

That places Algeria 47th out of 50 countries with data for 2012, putting it in the bottom quarter.

Dealing with construction permits, cost in Algeria, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Algeria, 2005 to 2012.
Year % of income per capita Change
2005 41.6%
2006 34.7% -16.6%
2007 34.1% -1.7%
2008 27.6% -19.1%
2009 23.4% -15.2%
2010 69.0% +194.9%
2011 61.4% -11.0%
2012 54.6% -11.1%

Averages by decade

DecadeAverage LowestHighest Years
2000s 32.3% 23.4% 41.6% 5
2010s 61.7% 54.6% 69.0% 3

Countries ranked near Algeria

  1. 44 Guinea 94.8% compare
  2. 45 Gabon 79.3% compare
  3. 46 Comoros 74.5% compare
  4. 48 South Africa 33.4% compare
  5. 49 Mauritius 28.5% compare
  6. 50 Seychelles 25.3% compare

See the full ranking of 56 places →

More private sector data for Algeria

All data for Algeria →

Frequently asked questions

What is dealing with construction permits, cost in Algeria?
Dealing with construction permits, cost in Algeria was 54.6% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Algeria?
The highest recorded value was 69.0% in 2010.
What is the lowest dealing with construction permits, cost recorded in Algeria?
The lowest recorded value was 23.4% in 2009.
How does Algeria rank for dealing with construction permits, cost?
Algeria ranks 47th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Algeria?
Over the last ten years it is up 31.2%. The long-run trend across the full record is rising.
Where does this Algeria data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Algeria. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 02 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/algeria/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/algeria/">Dealing with construction permits, cost in Algeria</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.