Dealing with construction permits: Cost (% of Warehouse value) - Score in Rwanda

Rwanda: Dealing with construction permits: Cost (% of Warehouse value) - Score was 43.0% in 2019. ◆ Volatile

Latest (2019)
43.0%
Change on year
up 8.1%
World rank
167th
of 191 countries
All-time high
57.7%
in 2015
All-time low
0.0%
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Cost (% of Warehouse value) - Score in Rwanda, 2005–2019

02040602005201220192005: 02006: 02007: 02008: 11.12009: 30.72010: 42.62011: 47.72012: 52.12013: 25.62014: 55.12015: 57.72016: 29.72017: 342018: 39.82019: 43

Source: World Bank.

Analysis

In 2019, dealing with construction permits: cost (% of warehouse value) - score in Rwanda stood at 43.0%.

The figure is up 8.1% on the previous year and up 39.9% over ten years.

Over the whole period, dealing with construction permits: cost (% of warehouse value) - score in Rwanda peaked at 57.7% in 2015 and was at its lowest, 0.0%, in 2005.

That places Rwanda 167th out of 191 countries with data for 2019, putting it in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost (% of Warehouse value) - Score in Rwanda, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) - Score in Rwanda, 2005 to 2019.
Year Value Change
2005 0.0% —
2006 0.0% —
2007 0.0% —
2008 11.1% —
2009 30.7% +176.2%
2010 42.6% +38.6%
2011 47.7% +12.0%
2012 52.1% +9.1%
2013 25.6% -50.8%
2014 55.1% +115.2%
2015 57.7% +4.6%
2016 29.7% -48.6%
2017 34.0% +14.5%
2018 39.8% +17.1%
2019 43.0% +8.1%

Rwanda compared with similar countries

  • Rwanda's 43.0% is above the median for low income countries, which is 18.5%, 2.3× the median. (24 countries reporting)
  • Rwanda's 43.0% is below the median for Sub-Saharan Africa, which is 63.1%, 68% of the median. (48 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 8.4% 0.0% 30.7% 5
2010s 42.7% 25.6% 57.7% 10

Countries ranked near Rwanda

  1. 164 Togo 52.2% compare
  2. 165 Lesotho 43.7% compare
  3. 166 Honduras 43.2% compare
  4. 168 Venezuela 39.8% compare
  5. 169 Jordan 39.5% compare
  6. 170 Burundi 39.4% compare

See the full ranking of 191 places →

More private sector data for Rwanda

All data for Rwanda →

Frequently asked questions

What is dealing with construction permits: cost (% of warehouse value) - score in Rwanda?
Dealing with construction permits: cost (% of warehouse value) - score in Rwanda was 43.0% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost (% of warehouse value) - score recorded in Rwanda?
The highest recorded value was 57.7% in 2015.
What is the lowest dealing with construction permits: cost (% of warehouse value) - score recorded in Rwanda?
The lowest recorded value was 0.0% in 2005.
How does Rwanda rank for dealing with construction permits: cost (% of warehouse value) - score?
Rwanda ranks 167th out of 191 countries with data for 2019.
Is dealing with construction permits: cost (% of warehouse value) - score rising or falling in Rwanda?
Over the last ten years it is up 39.9%. The long-run trend across the full record is volatile.
Where does this Rwanda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost (% of Warehouse value) - Score in Rwanda. Statizoid. Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value-score/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value-score/rwanda/">Dealing with construction permits: Cost (% of Warehouse value) - Score in Rwanda</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for cost benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.