Dealing with construction permits: Cost in Comoros

Comoros: Dealing with construction permits: Cost was 1.5% in 2019. ▼ Falling

Latest (2019)
1.5%
Change on year
down 40.0%
World rank
119th
of 185 countries
All-time high
3.1%
in 2005
All-time low
1.5%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Comoros, 2005–2019

01232005201220192005: 3.1 % of Warehouse value2006: 3.1 % of Warehouse value2007: 3 % of Warehouse value2008: 3 % of Warehouse value2009: 2.8 % of Warehouse value2010: 2.6 % of Warehouse value2011: 2.6 % of Warehouse value2012: 2.7 % of Warehouse value2013: 2.4 % of Warehouse value2014: 2.6 % of Warehouse value2015: 2.7 % of Warehouse value2016: 3 % of Warehouse value2017: 2.5 % of Warehouse value2018: 2.5 % of Warehouse value2019: 1.5 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Comoros is 1.5%, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 40.0% on the previous year and down 46.4% over ten years.

Over the whole period, dealing with construction permits: cost in Comoros peaked at 3.1% in 2005 and was at its lowest, 1.5%, in 2019.

Comoros ranks 119th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 3.0% 2.8% 3.1% 5
2010s 2.5% 1.5% 3.0% 10

Countries ranked near Comoros

  1. 117 Bangladesh 1.6% compare
  2. 117 Belarus 1.6% compare
  3. 119 Jamaica 1.5% compare
  4. 121 Antigua and Barbuda 1.4% compare
  5. 121 Gabon 1.4% compare
  6. 121 Serbia 1.4% compare

See the full ranking of 187 places →

More private sector data for Comoros

All data for Comoros →

Frequently asked questions

What is dealing with construction permits: cost in Comoros?
Dealing with construction permits: cost in Comoros was 1.5% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Comoros?
The highest recorded value was 3.1% in 2005.
What is the lowest dealing with construction permits: cost recorded in Comoros?
The lowest recorded value was 1.5% in 2019.
How does Comoros rank for dealing with construction permits: cost?
Comoros ranks 119th out of 185 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Comoros?
Over the last ten years it is down 46.4%. The long-run trend across the full record is falling.
Where does this Comoros data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.