Dealing with construction permits: Cost in Serbia

Serbia: Dealing with construction permits: Cost was 1.4% in 2019. ◆ Volatile

Latest (2019)
1.4%
Change on year
down 17.6%
World rank
123rd
of 187 countries
All-time high
76.4%
in 2005
All-time low
1.4%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Serbia, 2005–2019

0204060802005201220192005: 76.4 % of Warehouse value2006: 59.9 % of Warehouse value2007: 50.2 % of Warehouse value2008: 40.3 % of Warehouse value2009: 35.3 % of Warehouse value2010: 33.8 % of Warehouse value2011: 32.1 % of Warehouse value2012: 28.5 % of Warehouse value2013: 28.7 % of Warehouse value2014: 25.8 % of Warehouse value2015: 3.9 % of Warehouse value2016: 2.1 % of Warehouse value2017: 2 % of Warehouse value2018: 1.7 % of Warehouse value2019: 1.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Serbia is 1.4%, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 17.6% on the previous year and down 96.0% over ten years.

Over the whole period, dealing with construction permits: cost in Serbia peaked at 76.4% in 2005 and was at its lowest, 1.4%, in 2019.

That places Serbia 123rd out of 187 countries with data for 2019, putting it in the middle of the range.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost in Serbia, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Serbia, 2005 to 2019.
Year % of Warehouse value Change
2005 76.4%
2006 59.9% -21.6%
2007 50.2% -16.2%
2008 40.3% -19.7%
2009 35.3% -12.4%
2010 33.8% -4.2%
2011 32.1% -5.0%
2012 28.5% -11.2%
2013 28.7% +0.7%
2014 25.8% -10.1%
2015 3.9% -84.9%
2016 2.1% -46.2%
2017 2.0% -4.8%
2018 1.7% -15.0%
2019 1.4% -17.6%

Averages by decade

DecadeAverage LowestHighest Years
2000s 52.4% 35.3% 76.4% 5
2010s 16.0% 1.4% 33.8% 10

Countries ranked near Serbia

  1. 121 Comoros 1.5% compare
  2. 121 Jamaica 1.5% compare
  3. 123 Antigua and Barbuda 1.4% compare
  4. 123 Gabon 1.4% compare
  5. 126 Armenia 1.3% compare
  6. 126 Bolivia, Plurinational State of 1.3% compare
  7. 126 Egypt 1.3% compare
  8. 126 Malaysia 1.3% compare

See the full ranking of 187 places →

More private sector data for Serbia

All data for Serbia →

Frequently asked questions

What is dealing with construction permits: cost in Serbia?
Dealing with construction permits: cost in Serbia was 1.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Serbia?
The highest recorded value was 76.4% in 2005.
What is the lowest dealing with construction permits: cost recorded in Serbia?
The lowest recorded value was 1.4% in 2019.
How does Serbia rank for dealing with construction permits: cost?
Serbia ranks 123rd out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Serbia?
Over the last ten years it is down 96.0%. The long-run trend across the full record is volatile.
Where does this Serbia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Serbia. Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/serbia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/serbia/">Dealing with construction permits: Cost in Serbia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.