Dealing with construction permits: Cost (% of Warehouse value) in Mongolia
Mongolia: Dealing with construction permits: Cost (% of Warehouse value) was 0.1% in 2019. ◆ Volatile
Dealing with construction permits: Cost in Mongolia, 2005–2019
Source: World Bank. Measured in % of Warehouse value.
Analysis
In 2019, dealing with construction permits: cost in Mongolia stood at 0.1%. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 87.5% over ten years.
Over the whole period, dealing with construction permits: cost in Mongolia peaked at 2.6% in 2005 and was at its lowest, 0.1%, in 2013.
Mongolia ranks 185th of 188 countries on this measure, in the bottom quarter.
The series is highly variable year to year, so single readings are best treated with caution.
Dealing with construction permits: Cost (% of Warehouse value) in Mongolia, year by year
| Year | % of Warehouse value | Change |
|---|---|---|
| 2005 | 2.6% | — |
| 2006 | 2.1% | -19.2% |
| 2007 | 1.8% | -14.3% |
| 2008 | 1.1% | -38.9% |
| 2009 | 0.8% | -27.3% |
| 2010 | 0.9% | +12.5% |
| 2011 | 0.7% | -22.2% |
| 2012 | 0.6% | -14.3% |
| 2013 | 0.1% | -83.3% |
| 2014 | 0.1% | +0.0% |
| 2015 | 0.1% | +0.0% |
| 2016 | 0.1% | +0.0% |
| 2017 | 0.1% | +0.0% |
| 2018 | 0.1% | +0.0% |
| 2019 | 0.1% | +0.0% |
Mongolia compared with similar countries
- Mongolia's 0.1% is below the median for upper middle income countries, which is 1.8%, 6% of the median. (55 countries reporting)
- Mongolia's 0.1% is below the median for East Asia & Pacific, which is 2.2%, 5% of the median. (28 countries reporting)
Biggest year-on-year movements
Years where Dealing with construction permits: Cost (% of Warehouse value) in Mongolia changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.
| Year | Change | From | To |
|---|---|---|---|
| 2013 | -83.3% | 0.6% | 0.1% |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 1.7% | 0.8% | 2.6% | 5 |
| 2010s | 0.3% | 0.1% | 0.9% | 10 |
Countries ranked near Mongolia
- 185 Qatar 0.1% compare
- 185 Saint Vincent and the Grenadines 0.1% compare
- 185 Trinidad and Tobago 0.1% compare
More private sector data for Mongolia
- Merchandise trade 106.7% (2025)
- Food imports 11.0% (2023)
- Manufactures imports 65.3% (2023)
- Merchandise imports 11.31 billion current US$ (2025)
- Commercial service imports 4.77 billion current US$ (2025)
- Food exports 3.3% (2023)
- Manufactures exports 1.7% (2023)
- Merchandise exports 15.76 billion current US$ (2025)
- Commercial service exports 1.92 billion current US$ (2025)
- Merchandise exports (current US$), per capita 4,416 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: cost in Mongolia?
- Dealing with construction permits: cost in Mongolia was 0.1% in 2019, according to the World Bank.
- What is the highest dealing with construction permits: cost recorded in Mongolia?
- The highest recorded value was 2.6% in 2005.
- What is the lowest dealing with construction permits: cost recorded in Mongolia?
- The lowest recorded value was 0.1% in 2013.
- How does Mongolia rank for dealing with construction permits: cost?
- Mongolia ranks 185th out of 188 countries with data for 2019.
- Is dealing with construction permits: cost rising or falling in Mongolia?
- Over the last ten years it is down 87.5%. The long-run trend across the full record is volatile.
- Where does this Mongolia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.