Dealing with construction permits (DB06-15 methodology) - Score in North Macedonia

North Macedonia: Dealing with construction permits (DB06-15 methodology) - Score was 76.21 in 2014. ▲ Rising

Latest (2014)
76.21
Change on year
up 0.0%
World rank
35th
of 184 countries
All-time high
76.21
in 2014
All-time low
48.03
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in North Macedonia, 2005–2014

0204060802005200920142005: 482006: 49.52007: 50.62008: 522009: 58.92010: 58.92011: 74.12012: 72.22013: 76.22014: 76.2

Source: World Bank.

Analysis

In 2014, dealing with construction permits (db06-15 methodology) - score in North Macedonia stood at 76.21. That is the highest value across all 10 years on record.

The figure is up 58.7% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in North Macedonia peaked at 76.21 in 2014 and was at its lowest, 48.03, in 2005.

North Macedonia ranks 35th of 184 countries on this measure, in the top quarter.

Dealing with construction permits (DB06-15 methodology) - Score in North Macedonia, year by year

Annual values for Dealing with construction permits (DB06-15 methodology) - Score in North Macedonia, 2005 to 2014.
Year Value Change
2005 48.03 —
2006 49.46 +3.0%
2007 50.59 +2.3%
2008 52.03 +2.8%
2009 58.87 +13.1%
2010 58.89 +0.0%
2011 74.06 +25.8%
2012 72.22 -2.5%
2013 76.18 +5.5%
2014 76.21 +0.0%

North Macedonia compared with similar countries

  • North Macedonia's 76.21 is above the median for upper middle income countries, which is 69.61, 1.1× the median. (55 countries reporting)
  • North Macedonia's 76.21 is above the median for Europe & Central Asia, which is 66.67, 1.1× the median. (48 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 51.8 48.03 58.87 5
2010s 71.51 58.89 76.21 5

Countries ranked near North Macedonia

  1. 32 Iceland 77.64 compare
  2. 33 Saudi Arabia 76.41 compare
  3. 34 Oman 76.3 compare
  4. 36 Sao Tome and Principe 76.06 compare
  5. 37 Paraguay 75.99 compare
  6. 38 Eswatini 75.86 compare

See the full ranking of 184 places →

More private sector data for North Macedonia

All data for North Macedonia →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in North Macedonia?
Dealing with construction permits (db06-15 methodology) - score in North Macedonia was 76.21 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in North Macedonia?
The highest recorded value was 76.21 in 2014.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in North Macedonia?
The lowest recorded value was 48.03 in 2005.
How does North Macedonia rank for dealing with construction permits (db06-15 methodology) - score?
North Macedonia ranks 35th out of 184 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in North Macedonia?
Over the last ten years it is up 58.7%. The long-run trend across the full record is rising.
Where does this North Macedonia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB06-15 methodology) - Score in North Macedonia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db06-15-methodology-score/north-macedonia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db06-15-methodology-score/north-macedonia/">Dealing with construction permits (DB06-15 methodology) - Score in North Macedonia</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,819 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.