Dealing with construction permits (DB16-20 methodology) - Score in Colombia

Colombia: Dealing with construction permits (DB16-20 methodology) - Score was 69.09 in 2019. ▬ Flat

Latest (2019)
69.09
Change on year
up 0.5%
World rank
88th
of 188 countries
All-time high
69.09
in 2019
All-time low
67.77
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Colombia, 2014–2019

02040602014201620192014: 67.82015: 68.12016: 68.62017: 68.72018: 68.82019: 69.1

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Colombia stood at 69.09. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 0.5% on the previous year and up 1.9% over ten years.

That places Colombia 88th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Colombia

  1. 85 Philippines 69.96 compare
  2. 86 Greece 69.53 compare
  3. 87 Netherlands 69.4 compare
  4. 89 Kyrgyzstan 69.03 compare
  5. 90 Bhutan 68.94 compare
  6. 91 San Marino 68.91 compare

See the full ranking of 190 places →

More private sector data for Colombia

All data for Colombia →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Colombia?
Dealing with construction permits (db16-20 methodology) - score in Colombia was 69.09 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Colombia?
The highest recorded value was 69.09 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Colombia?
The lowest recorded value was 67.77 in 2014.
How does Colombia rank for dealing with construction permits (db16-20 methodology) - score?
Colombia ranks 88th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Colombia?
Over the last ten years it is up 1.9%. The long-run trend across the full record is flat.
Where does this Colombia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.