Dealing with construction permits: Time (days) - Score (Time days) in Australia

Australia: Dealing with construction permits: Time (days) - Score was 72.77 in 2019. ▲ Rising

Latest (2019)
72.77
Change on year
up 0.2%
World rank
72nd
of 191 countries
All-time high
75.22
in 2009
All-time low
66.57
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Australia, 2005–2019

0204060802005201220192005: 66.62006: 66.62007: 66.62008: 66.62009: 75.22010: 75.22011: 75.22012: 75.22013: 75.22014: 75.22015: 75.22016: 72.62017: 72.62018: 72.62019: 72.8

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in Australia is 72.77, measured in 2019.

Compared with earlier readings it is up 0.2% on the previous year and down 3.3% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Australia peaked at 75.22 in 2009 and was at its lowest, 66.57, in 2005.

That places Australia 72nd out of 191 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time (days) - Score in Australia, year by year

Annual values for Dealing with construction permits: Time (days) - Score in Australia, 2005 to 2019.
Year Value Change
2005 66.57 —
2006 66.57 +0.0%
2007 66.57 +0.0%
2008 66.57 +0.0%
2009 75.22 +13.0%
2010 75.22 +0.0%
2011 75.22 +0.0%
2012 75.22 +0.0%
2013 75.22 +0.0%
2014 75.22 +0.0%
2015 75.22 +0.0%
2016 72.62 -3.4%
2017 72.62 +0.0%
2018 72.62 +0.0%
2019 72.77 +0.2%

Australia compared with similar countries

  • Australia's 72.77 is above the median for high income countries, which is 65.78, 1.1× the median. (62 countries reporting)
  • Australia's 72.77 is below the median for East Asia & Pacific, which is 77.62, 94% of the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 68.3 66.57 75.22 5
2010s 74.19 72.62 75.22 10

Countries ranked near Australia

  1. 69 Mozambique 73.49 compare
  2. 69 Nepal 73.49 compare
  3. 71 Philippines 72.91 compare
  4. 73 Burkina Faso 72.62 compare
  5. 73 Paraguay 72.62 compare
  6. 75 Democratic Republic of Congo 72.33 compare

See the full ranking of 191 places →

More private sector data for Australia

All data for Australia →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Australia?
Dealing with construction permits: time (days) - score in Australia was 72.77 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Australia?
The highest recorded value was 75.22 in 2009.
What is the lowest dealing with construction permits: time (days) - score recorded in Australia?
The lowest recorded value was 66.57 in 2005.
How does Australia rank for dealing with construction permits: time (days) - score?
Australia ranks 72nd out of 191 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Australia?
Over the last ten years it is down 3.3%. The long-run trend across the full record is rising.
Where does this Australia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time (days) - Score in Australia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/australia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/australia/">Dealing with construction permits: Time (days) - Score in Australia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.