Dealing with construction permits: Time (days) - Score in Burundi
Burundi: Dealing with construction permits: Time (days) - Score was 87.32 in 2019. ▲ Rising
Dealing with construction permits: Time (days) - Score in Burundi, 2005–2019
Source: World Bank.
Analysis
Burundi recorded 87.32 for dealing with construction permits: time (days) - score in 2019. That is the highest value across all 15 years on record.
That represents a change of up 27.8% over ten years.
Over the whole period, dealing with construction permits: time (days) - score in Burundi peaked at 87.32 in 2017 and was at its lowest, 68.3, in 2005.
Burundi ranks 14th of 188 countries on this measure, in the top 10%.
The long-run direction has been consistently rising across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 68.3 | 68.3 | 68.3 | 5 |
| 2010s | 79.34 | 68.3 | 87.32 | 10 |
Countries ranked near Burundi
More private sector data for Burundi
- Merchandise trade 45.2% (2025)
- Food imports 13.7% (2023)
- Manufactures imports 61.1% (2023)
- Merchandise imports 1.19 billion current US$ (2025)
- Food exports 46.0% (2023)
- Manufactures exports 15.2% (2023)
- Merchandise exports 332.00 million current US$ (2025)
- Commercial service exports 77.22 million current US$ (2025)
- Transport services 60.3% (2025)
- Computer, communications and other services 19.8% (2025)
Frequently asked questions
- What is dealing with construction permits: time (days) - score in Burundi?
- Dealing with construction permits: time (days) - score in Burundi was 87.32 in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time (days) - score recorded in Burundi?
- The highest recorded value was 87.32 in 2017.
- What is the lowest dealing with construction permits: time (days) - score recorded in Burundi?
- The lowest recorded value was 68.3 in 2005.
- How does Burundi rank for dealing with construction permits: time (days) - score?
- Burundi ranks 14th out of 188 countries with data for 2019.
- Is dealing with construction permits: time (days) - score rising or falling in Burundi?
- Over the last ten years it is up 27.8%. The long-run trend across the full record is rising.
- Where does this Burundi data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.