Dealing with construction permits: Time (days) - Score in Lebanon

Lebanon: Dealing with construction permits: Time (days) - Score was 27.95 in 2019. ▬ Flat

Latest (2019)
27.95
Change on year
unchanged
World rank
173rd
of 188 countries
All-time high
28.82
in 2005
All-time low
27.95
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Lebanon, 2005–2019

01020302005201220192005: 28.82006: 28.82007: 28.82008: 28.82009: 28.82010: 28.82011: 28.82012: 28.82013: 282014: 282015: 282016: 282017: 282018: 282019: 28

Source: World Bank.

Analysis

In 2019, dealing with construction permits: time (days) - score in Lebanon stood at 27.95. That is the lowest value across all 15 years on record.

That represents a change of down 3.0% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Lebanon peaked at 28.82 in 2005 and was at its lowest, 27.95, in 2013.

That places Lebanon 173rd out of 188 countries with data for 2019, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 28.82 28.82 28.82 5
2010s 28.21 27.95 28.82 10

Countries ranked near Lebanon

  1. 170 Uruguay 31.12 compare
  2. 171 Bangladesh 28.67 compare
  3. 172 Gabon 28.24 compare
  4. 174 Moldova 27.38 compare
  5. 175 Slovak Republic 21.04 compare
  6. 176 El Salvador 18.16 compare

See the full ranking of 190 places →

More private sector data for Lebanon

All data for Lebanon →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Lebanon?
Dealing with construction permits: time (days) - score in Lebanon was 27.95 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Lebanon?
The highest recorded value was 28.82 in 2005.
What is the lowest dealing with construction permits: time (days) - score recorded in Lebanon?
The lowest recorded value was 27.95 in 2013.
How does Lebanon rank for dealing with construction permits: time (days) - score?
Lebanon ranks 173rd out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Lebanon?
Over the last ten years it is down 3.0%. The long-run trend across the full record is flat.
Where does this Lebanon data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.