Dealing with construction permits: Time (days) - Score (Time days) in Moldova

Moldova: Dealing with construction permits: Time (days) - Score was 27.38 in 2019. ▲ Rising

Latest (2019)
27.38
Change on year
up 50.8%
World rank
177th
of 191 countries
All-time high
27.38
in 2019
All-time low
9.22
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Moldova, 2005–2019

101520252005201220192005: 9.22006: 9.22007: 9.22008: 9.22009: 9.22010: 9.22011: 18.22012: 18.22013: 18.22014: 18.22015: 18.22016: 18.22017: 18.22018: 18.22019: 27.4

Source: World Bank.

Analysis

Moldova recorded 27.38 for dealing with construction permits: time (days) - score in 2019. That is the highest value across all 15 years on record.

The figure is up 50.8% on the previous year and up 196.9% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Moldova peaked at 27.38 in 2019 and was at its lowest, 9.22, in 2005.

That places Moldova 177th out of 191 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time (days) - Score in Moldova, year by year

Annual values for Dealing with construction permits: Time (days) - Score in Moldova, 2005 to 2019.
Year Value Change
2005 9.22 —
2006 9.22 +0.0%
2007 9.22 +0.0%
2008 9.22 +0.0%
2009 9.22 +0.0%
2010 9.22 +0.0%
2011 18.16 +96.9%
2012 18.16 +0.0%
2013 18.16 +0.0%
2014 18.16 +0.0%
2015 18.16 +0.0%
2016 18.16 +0.0%
2017 18.16 +0.0%
2018 18.16 +0.0%
2019 27.38 +50.8%

Moldova compared with similar countries

  • Moldova's 27.38 is below the median for upper middle income countries, which is 69.6, 39% of the median. (56 countries reporting)
  • Moldova's 27.38 is below the median for Europe & Central Asia, which is 62.54, 44% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 9.22 9.22 9.22 5
2010s 18.18 9.22 27.38 10

Countries ranked near Moldova

  1. 174 Bangladesh 28.67 compare
  2. 175 Gabon 28.24 compare
  3. 176 Lebanon 27.95 compare
  4. 178 Slovakia 21.04 compare
  5. 179 El Salvador 18.16 compare
  6. 180 Argentina 15.85 compare

See the full ranking of 191 places →

More private sector data for Moldova

All data for Moldova →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Moldova?
Dealing with construction permits: time (days) - score in Moldova was 27.38 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Moldova?
The highest recorded value was 27.38 in 2019.
What is the lowest dealing with construction permits: time (days) - score recorded in Moldova?
The lowest recorded value was 9.22 in 2005.
How does Moldova rank for dealing with construction permits: time (days) - score?
Moldova ranks 177th out of 191 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Moldova?
Over the last ten years it is up 196.9%. The long-run trend across the full record is rising.
Where does this Moldova data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time (days) - Score in Moldova. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/moldova/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/moldova/">Dealing with construction permits: Time (days) - Score in Moldova</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.