Dealing with construction permits: Time (days) - Score (Time days) in North Macedonia

North Macedonia: Dealing with construction permits: Time (days) - Score was 81.27 in 2019. ▲ Rising

Latest (2019)
81.27
Change on year
unchanged
World rank
32nd
of 191 countries
All-time high
81.27
in 2013
All-time low
54.76
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in North Macedonia, 2005–2019

0204060802005201220192005: 54.82006: 54.82007: 54.82008: 54.82009: 69.72010: 69.72011: 77.22012: 76.92013: 81.32014: 81.32015: 81.32016: 81.32017: 81.32018: 81.32019: 81.3

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in North Macedonia is 81.27, measured in 2019. That is the highest value across all 15 years on record.

The figure is up 16.5% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in North Macedonia peaked at 81.27 in 2013 and was at its lowest, 54.76, in 2005.

North Macedonia ranks 32nd of 191 countries on this measure, in the top quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time (days) - Score in North Macedonia, year by year

Annual values for Dealing with construction permits: Time (days) - Score in North Macedonia, 2005 to 2019.
Year Value Change
2005 54.76 —
2006 54.76 +0.0%
2007 54.76 +0.0%
2008 54.76 +0.0%
2009 69.74 +27.4%
2010 69.74 +0.0%
2011 77.23 +10.7%
2012 76.95 -0.4%
2013 81.27 +5.6%
2014 81.27 +0.0%
2015 81.27 +0.0%
2016 81.27 +0.0%
2017 81.27 +0.0%
2018 81.27 +0.0%
2019 81.27 +0.0%

North Macedonia compared with similar countries

  • North Macedonia's 81.27 is above the median for upper middle income countries, which is 69.6, 1.2× the median. (56 countries reporting)
  • North Macedonia's 81.27 is above the median for Europe & Central Asia, which is 62.54, 1.3× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 57.75 54.76 69.74 5
2010s 79.28 69.74 81.27 10

Countries ranked near North Macedonia

  1. 29 Benin 82.13 compare
  2. 29 Myanmar 82.13 compare
  3. 31 Palau 81.56 compare
  4. 33 Laos 80.98 compare
  5. 33 Saint Vincent and the Grenadines 80.98 compare
  6. 35 New Zealand 80.69 compare

See the full ranking of 191 places →

More private sector data for North Macedonia

All data for North Macedonia →

Frequently asked questions

What is dealing with construction permits: time (days) - score in North Macedonia?
Dealing with construction permits: time (days) - score in North Macedonia was 81.27 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in North Macedonia?
The highest recorded value was 81.27 in 2013.
What is the lowest dealing with construction permits: time (days) - score recorded in North Macedonia?
The lowest recorded value was 54.76 in 2005.
How does North Macedonia rank for dealing with construction permits: time (days) - score?
North Macedonia ranks 32nd out of 191 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in North Macedonia?
Over the last ten years it is up 16.5%. The long-run trend across the full record is rising.
Where does this North Macedonia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time (days) - Score in North Macedonia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/north-macedonia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/north-macedonia/">Dealing with construction permits: Time (days) - Score in North Macedonia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.