Dealing with construction permits: Time (days) - Score (Time days) in North Macedonia
North Macedonia: Dealing with construction permits: Time (days) - Score was 81.27 in 2019. ▲ Rising
Dealing with construction permits: Time (days) - Score in North Macedonia, 2005–2019
Source: World Bank.
Analysis
The most recent figure for dealing with construction permits: time (days) - score in North Macedonia is 81.27, measured in 2019. That is the highest value across all 15 years on record.
The figure is up 16.5% over ten years.
Over the whole period, dealing with construction permits: time (days) - score in North Macedonia peaked at 81.27 in 2013 and was at its lowest, 54.76, in 2005.
North Macedonia ranks 32nd of 191 countries on this measure, in the top quarter.
The long-run direction has been consistently rising across the 15 years of available data.
Dealing with construction permits: Time (days) - Score in North Macedonia, year by year
| Year | Value | Change |
|---|---|---|
| 2005 | 54.76 | — |
| 2006 | 54.76 | +0.0% |
| 2007 | 54.76 | +0.0% |
| 2008 | 54.76 | +0.0% |
| 2009 | 69.74 | +27.4% |
| 2010 | 69.74 | +0.0% |
| 2011 | 77.23 | +10.7% |
| 2012 | 76.95 | -0.4% |
| 2013 | 81.27 | +5.6% |
| 2014 | 81.27 | +0.0% |
| 2015 | 81.27 | +0.0% |
| 2016 | 81.27 | +0.0% |
| 2017 | 81.27 | +0.0% |
| 2018 | 81.27 | +0.0% |
| 2019 | 81.27 | +0.0% |
North Macedonia compared with similar countries
- North Macedonia's 81.27 is above the median for upper middle income countries, which is 69.6, 1.2× the median. (56 countries reporting)
- North Macedonia's 81.27 is above the median for Europe & Central Asia, which is 62.54, 1.3× the median. (49 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 57.75 | 54.76 | 69.74 | 5 |
| 2010s | 79.28 | 69.74 | 81.27 | 10 |
Countries ranked near North Macedonia
More private sector data for North Macedonia
- Merchandise trade 115.8% (2025)
- Food imports 11.7% (2024)
- Manufactures imports 64.5% (2024)
- Merchandise imports 13.06 billion current US$ (2025)
- Food exports 10.6% (2024)
- Manufactures exports 80.6% (2024)
- Merchandise exports 9.06 billion current US$ (2025)
- Merchandise exports (current US$), per capita 4,973 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.4741 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 7.53 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: time (days) - score in North Macedonia?
- Dealing with construction permits: time (days) - score in North Macedonia was 81.27 in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time (days) - score recorded in North Macedonia?
- The highest recorded value was 81.27 in 2013.
- What is the lowest dealing with construction permits: time (days) - score recorded in North Macedonia?
- The lowest recorded value was 54.76 in 2005.
- How does North Macedonia rank for dealing with construction permits: time (days) - score?
- North Macedonia ranks 32nd out of 191 countries with data for 2019.
- Is dealing with construction permits: time (days) - score rising or falling in North Macedonia?
- Over the last ten years it is up 16.5%. The long-run trend across the full record is rising.
- Where does this North Macedonia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.