Dealing with construction permits: Time (days) - Score in Saint Kitts and Nevis

Saint Kitts and Nevis: Dealing with construction permits: Time (days) - Score was 77.23 in 2019. ▬ Flat

Latest (2019)
77.23
Change on year
unchanged
World rank
54th
of 188 countries
All-time high
77.23
in 2005
All-time low
77.23
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Saint Kitts and Nevis, 2005–2019

0204060802005201220192005: 77.22006: 77.22007: 77.22008: 77.22009: 77.22010: 77.22011: 77.22012: 77.22013: 77.22014: 77.22015: 77.22016: 77.22017: 77.22018: 77.22019: 77.2

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in Saint Kitts and Nevis is 77.23, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Saint Kitts and Nevis peaked at 77.23 in 2005 and was at its lowest, 77.23, in 2005.

That places Saint Kitts and Nevis 54th out of 188 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 77.23 77.23 77.23 5
2010s 77.23 77.23 77.23 10

Countries ranked near Saint Kitts and Nevis

  1. 52 Mauritania 77.52 compare
  2. 53 Nigeria 77.29 compare
  3. 54 Panama 77.23 compare
  4. 56 India 76.88 compare
  5. 57 Comoros 76.66 compare

See the full ranking of 190 places →

More private sector data for Saint Kitts and Nevis

All data for Saint Kitts and Nevis →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Saint Kitts and Nevis?
Dealing with construction permits: time (days) - score in Saint Kitts and Nevis was 77.23 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Saint Kitts and Nevis?
The highest recorded value was 77.23 in 2005.
What is the lowest dealing with construction permits: time (days) - score recorded in Saint Kitts and Nevis?
The lowest recorded value was 77.23 in 2005.
How does Saint Kitts and Nevis rank for dealing with construction permits: time (days) - score?
Saint Kitts and Nevis ranks 54th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Saint Kitts and Nevis?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Saint Kitts and Nevis data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.