Dealing with construction permits: Time (days) - Score in Sweden

Sweden: Dealing with construction permits: Time (days) - Score was 73.78 in 2019. ▲ Rising

Latest (2019)
73.78
Change on year
unchanged
World rank
68th
of 188 countries
All-time high
73.78
in 2012
All-time low
65.13
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Sweden, 2005–2019

0204060802005201220192005: 65.12006: 65.12007: 65.12008: 65.12009: 65.12010: 65.12011: 65.12012: 73.82013: 73.82014: 73.82015: 73.82016: 73.82017: 73.82018: 73.82019: 73.8

Source: World Bank.

Analysis

Sweden recorded 73.78 for dealing with construction permits: time (days) - score in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 13.3% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Sweden peaked at 73.78 in 2012 and was at its lowest, 65.13, in 2005.

That places Sweden 68th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 65.13 65.13 65.13 5
2010s 72.05 65.13 73.78 10

Countries ranked near Sweden

  1. 65 Azerbaijan 74.06 compare
  2. 65 Eswatini 74.06 compare
  3. 65 Saint Lucia 74.06 compare
  4. 69 Mozambique 73.49 compare
  5. 69 Nepal 73.49 compare
  6. 71 Philippines 72.91 compare

See the full ranking of 190 places →

More private sector data for Sweden

All data for Sweden →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Sweden?
Dealing with construction permits: time (days) - score in Sweden was 73.78 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Sweden?
The highest recorded value was 73.78 in 2012.
What is the lowest dealing with construction permits: time (days) - score recorded in Sweden?
The lowest recorded value was 65.13 in 2005.
How does Sweden rank for dealing with construction permits: time (days) - score?
Sweden ranks 68th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Sweden?
Over the last ten years it is up 13.3%. The long-run trend across the full record is rising.
Where does this Sweden data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.