Getting electricity (DB10-15 methodology) - Score in Algeria
Algeria: Getting electricity (DB10-15 methodology) - Score was 59.98 in 2014. ▬ Flat
Getting electricity (DB10-15 methodology) - Score in Algeria, 2009–2014
Source: World Bank.
Analysis
Algeria recorded 59.98 for getting electricity (db10-15 methodology) - score in 2014.
The figure is up 1.7% on the previous year and down 3.3% over ten years.
Algeria ranks 141st of 181 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 62.02 | 62.02 | 62.02 | 1 |
| 2010s | 60.96 | 58.97 | 62.46 | 5 |
Countries ranked near Algeria
More private sector data for Algeria
- Merchandise trade 33.3% (2025)
- Food imports 20.2% (2017)
- Manufactures imports 73.0% (2017)
- Merchandise imports 50.10 billion current US$ (2025)
- Food exports 1.0% (2017)
- Manufactures exports 2.7% (2017)
- Merchandise exports 45.40 billion current US$ (2025)
- Commercial service exports 4.17 billion current US$ (2024)
- Transport services 50.8% (2024)
- Computer, communications and other services 37.8% (2024)
Frequently asked questions
- What is getting electricity (db10-15 methodology) - score in Algeria?
- Getting electricity (db10-15 methodology) - score in Algeria was 59.98 in 2014, according to the World Bank.
- What is the highest getting electricity (db10-15 methodology) - score recorded in Algeria?
- The highest recorded value was 62.46 in 2012.
- What is the lowest getting electricity (db10-15 methodology) - score recorded in Algeria?
- The lowest recorded value was 58.97 in 2013.
- How does Algeria rank for getting electricity (db10-15 methodology) - score?
- Algeria ranks 141st out of 181 countries with data for 2014.
- Is getting electricity (db10-15 methodology) - score rising or falling in Algeria?
- Over the last ten years it is down 3.3%. The long-run trend across the full record is flat.
- Where does this Algeria data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.