Getting electricity (DB10-15 methodology) - Score in Mozambique

Mozambique: Getting electricity (DB10-15 methodology) - Score was 59.21 in 2014. ▼ Falling

Latest (2014)
59.21
Change on year
up 2.6%
World rank
143rd
of 181 countries
All-time high
73.6
in 2010
All-time low
57.68
in 2011
Years of data
6
2009–2014

Getting electricity (DB10-15 methodology) - Score in Mozambique, 2009–2014

0204060802009201120142009: 71.62010: 73.62011: 57.72012: 58.52013: 57.72014: 59.2

Source: World Bank.

Analysis

The most recent figure for getting electricity (db10-15 methodology) - score in Mozambique is 59.21, measured in 2014.

The figure is up 2.6% on the previous year and down 17.3% over ten years.

That places Mozambique 143rd out of 181 countries with data for 2014, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 71.6 71.6 71.6 1
2010s 61.34 57.68 73.6 5

Countries ranked near Mozambique

  1. 140 Spain 60.31 compare
  2. 141 Algeria 59.98 compare
  3. 142 Canada 59.27 compare
  4. 144 Albania 58.34 compare
  5. 145 Zimbabwe 58.26 compare
  6. 146 Montenegro 57.84 compare

See the full ranking of 183 places →

More private sector data for Mozambique

All data for Mozambique →

Frequently asked questions

What is getting electricity (db10-15 methodology) - score in Mozambique?
Getting electricity (db10-15 methodology) - score in Mozambique was 59.21 in 2014, according to the World Bank.
What is the highest getting electricity (db10-15 methodology) - score recorded in Mozambique?
The highest recorded value was 73.6 in 2010.
What is the lowest getting electricity (db10-15 methodology) - score recorded in Mozambique?
The lowest recorded value was 57.68 in 2011.
How does Mozambique rank for getting electricity (db10-15 methodology) - score?
Mozambique ranks 143rd out of 181 countries with data for 2014.
Is getting electricity (db10-15 methodology) - score rising or falling in Mozambique?
Over the last ten years it is down 17.3%. The long-run trend across the full record is falling.
Where does this Mozambique data come from?
The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.