Getting electricity (DB10-15 methodology) - Score in Singapore

Singapore: Getting electricity (DB10-15 methodology) - Score was 92.45 in 2014. ▬ Flat

Latest (2014)
92.45
Change on year
up 0.0%
World rank
11th
of 181 countries
All-time high
92.45
in 2014
All-time low
92.42
in 2009
Years of data
6
2009–2014

Getting electricity (DB10-15 methodology) - Score in Singapore, 2009–2014

0204060801002009201120142009: 92.42010: 92.42011: 92.42012: 92.42013: 92.42014: 92.5

Source: World Bank.

Analysis

In 2014, getting electricity (db10-15 methodology) - score in Singapore stood at 92.45. That is the highest value across all 6 years on record.

That represents a change of up 0.0% over ten years.

Singapore ranks 11th of 181 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 92.42 92.42 92.42 1
2010s 92.44 92.42 92.45 5

Countries ranked near Singapore

  1. 8 Iceland 93.81 compare
  2. 9 St. Kitts and Nevis 93.25 compare
  3. 10 Czechia 92.77 compare
  4. 12 Malaysia 92.45 compare
  5. 13 Hong Kong 91.54 compare
  6. 14 Denmark 91.07 compare

See the full ranking of 183 places →

More private sector data for Singapore

All data for Singapore →

Frequently asked questions

What is getting electricity (db10-15 methodology) - score in Singapore?
Getting electricity (db10-15 methodology) - score in Singapore was 92.45 in 2014, according to the World Bank.
What is the highest getting electricity (db10-15 methodology) - score recorded in Singapore?
The highest recorded value was 92.45 in 2014.
What is the lowest getting electricity (db10-15 methodology) - score recorded in Singapore?
The lowest recorded value was 92.42 in 2009.
How does Singapore rank for getting electricity (db10-15 methodology) - score?
Singapore ranks 11th out of 181 countries with data for 2014.
Is getting electricity (db10-15 methodology) - score rising or falling in Singapore?
Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
Where does this Singapore data come from?
The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.