Getting electricity (DB10-15 methodology) - Score in Trinidad and Tobago

Trinidad and Tobago: Getting electricity (DB10-15 methodology) - Score was 88.18 in 2014. ▬ Flat

Latest (2014)
88.18
Change on year
up 0.0%
World rank
22nd
of 184 countries
All-time high
88.19
in 2012
All-time low
87.99
in 2009
Years of data
6
2009–2014

Getting electricity (DB10-15 methodology) - Score in Trinidad and Tobago, 2009–2014

0204060802009201120142009: 882010: 88.22011: 88.22012: 88.22013: 88.22014: 88.2

Source: World Bank.

Analysis

The most recent figure for getting electricity (db10-15 methodology) - score in Trinidad and Tobago is 88.18, measured in 2014.

That represents a change of up 0.2% over ten years.

Trinidad and Tobago ranks 22nd of 184 countries on this measure, in the top quarter.

Getting electricity (DB10-15 methodology) - Score in Trinidad and Tobago, year by year

Annual values for Getting electricity (DB10-15 methodology) - Score in Trinidad and Tobago, 2009 to 2014.
Year Value Change
2009 87.99 —
2010 88.18 +0.2%
2011 88.18 -0.0%
2012 88.19 +0.0%
2013 88.18 -0.0%
2014 88.18 +0.0%

Trinidad and Tobago compared with similar countries

  • Trinidad and Tobago's 88.18 is above the median for high income countries, which is 81.54, 1.1× the median. (59 countries reporting)
  • Trinidad and Tobago's 88.18 is above the median for Latin America & Caribbean, which is 79.64, 1.1× the median. (32 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 87.99 87.99 87.99 1
2010s 88.18 88.18 88.19 5

Countries ranked near Trinidad and Tobago

  1. 19 Georgia 90.25 compare
  2. 20 Samoa 89.1 compare
  3. 21 Japan 88.79 compare
  4. 23 Austria 87.75 compare
  5. 24 Mauritius 87.56 compare
  6. 25 Norway 87.44 compare

See the full ranking of 184 places →

More private sector data for Trinidad and Tobago

All data for Trinidad and Tobago →

Frequently asked questions

What is getting electricity (db10-15 methodology) - score in Trinidad and Tobago?
Getting electricity (db10-15 methodology) - score in Trinidad and Tobago was 88.18 in 2014, according to the World Bank.
What is the highest getting electricity (db10-15 methodology) - score recorded in Trinidad and Tobago?
The highest recorded value was 88.19 in 2012.
What is the lowest getting electricity (db10-15 methodology) - score recorded in Trinidad and Tobago?
The lowest recorded value was 87.99 in 2009.
How does Trinidad and Tobago rank for getting electricity (db10-15 methodology) - score?
Trinidad and Tobago ranks 22nd out of 184 countries with data for 2014.
Is getting electricity (db10-15 methodology) - score rising or falling in Trinidad and Tobago?
Over the last ten years it is up 0.2%. The long-run trend across the full record is flat.
Where does this Trinidad and Tobago data come from?
The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Getting electricity (DB10-15 methodology) - Score in Trinidad and Tobago. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/getting-electricity-db10-15-methodology-score/trinidad-and-tobago/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/getting-electricity-db10-15-methodology-score/trinidad-and-tobago/">Getting electricity (DB10-15 methodology) - Score in Trinidad and Tobago</a> — Statizoid

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,104 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.