Getting electricity (DB16-20 methodology) - Score in Congo
Congo: Getting electricity (DB16-20 methodology) - Score was 32.7 in 2019. ▼ Falling
Getting electricity (DB16-20 methodology) - Score in Congo, 2014–2019
Source: World Bank.
Analysis
In 2019, getting electricity (db16-20 methodology) - score in Congo stood at 32.7.
The figure is up 12.8% on the previous year and down 7.5% over ten years.
Congo ranks 177th of 188 countries on this measure, in the bottom quarter.
Countries ranked near Congo
- 174 Bangladesh 34.87 compare
- 175 Democratic Republic of Congo 34.67 compare
- 176 Benin 33.84 compare
- 178 Chad 32.17 compare
- 179 Sierra Leone 31.6 compare
- 180 Guinea-Bissau 29.7 compare
More private sector data for Congo
- Merchandise trade 94.4% (2025)
- Food imports 21.2% (2023)
- Manufactures imports 71.4% (2023)
- Merchandise imports 7.90 billion current US$ (2025)
- Food exports 0.2% (2023)
- Manufactures exports 10.3% (2023)
- Merchandise exports 7.50 billion current US$ (2025)
- Commercial service exports 225.02 million current US$ (2021)
- Transport services 33.8% (2021)
- Computer, communications and other services 61.4% (2021)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in Congo?
- Getting electricity (db16-20 methodology) - score in Congo was 32.7 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in Congo?
- The highest recorded value was 35.46 in 2015.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in Congo?
- The lowest recorded value was 28.42 in 2017.
- How does Congo rank for getting electricity (db16-20 methodology) - score?
- Congo ranks 177th out of 188 countries with data for 2019.
- Is getting electricity (db16-20 methodology) - score rising or falling in Congo?
- Over the last ten years it is down 7.5%. The long-run trend across the full record is falling.
- Where does this Congo data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.